211 references shown
Project : The Government of the Republic of Madagascar, through the Project Preparation Facility for the Mobilization, Protection and Enhancement of Water Resources and Strengthening of Climate Change Resilience, appointed the Consortium to prepare the Water Resources Development and Management Master Plans (SDAGRE) for the six (6) intervention regions of the PPF PMPVREAU.
OVERALL OBJECTIVE
To develop a Water Resources Development and Management Master Plan for each of the following six regions: Analamanga, Vakinankaratra, Haute Matsiatra, Amoron'i Mania, Ihorombe and Androy.
SPECIFIC OBJECTIVES
- Establish a baseline assessment through research, data collection and analysis;
- Define development options based on the baseline assessment;
- Prepare the Water Resources Development and Management Master Plans, covering all components specified in the Terms of Reference.
Services provided : Organization and monitoring of data collection operations and public consultations in the regions
Planning of institutional meetings
Processing and analysis of collected data and information
Analysis of the institutional anchoring of water resources management structures
Analysis of issues, challenges and the adequacy of water resources versus needs
Analysis of capacity-building needs and IWRM financing sources
Preparation, technical validation (virtual meeting) and finalization of the baseline assessment report, including maps
Definition of SDAGRE guidelines and proposed institutional and legal anchoring for the stakeholders concerned
Definition of the major IWRM challenges (abstraction, discharge, protection, storage of resources)
Proposal of awareness-raising/capacity-building tools and financing rationalization mechanisms
Preparation of an intersectoral coordination plan (drinking water, agriculture, industry, waste, aquatic ecosystems)
Participation in the development of hydrological models for assessing water availability
Proposal of an SDAGRE implementation strategy
Supervision of the preparation of the Atlas of the SDAGRE management area
Preparation, presentation/validation at workshop and finalization of the final report
Meteorological studies
Collection and analysis of data (topographic, soil, pedological, etc.)
Characterization of the situation
Identification and characterization of protective measures
Development of risk mitigation measures
Consideration of comments from the authorities
Report writing
Defence of files before the authorities
Project : The overall objective of the assignment is:
To clarify and operationalize the implementation of a national sanitation strategy in the Gabonese Republic.
The specific objectives are as follows:
SO1 Analyse the current constraints
SO2 Establish the basic principles and define the institutional and organizational framework and the operational mechanisms for the strategy to be developed
SO3 Analyse the socio-economic context with regard to the population's ability and willingness to pay for sanitation services
SO4 Propose a technical sanitation system, selection criteria and recommendations for the sector, together with specific provisions for urban areas
SO5 Define the investment, operating and maintenance costs of the facilities
SO6 Propose a tariff structure that takes into account the population's standard of living
SO7 Define outreach methods for promoting «hygiene / sanitation» and the conditions for sustaining/scaling up activities
SO8 Prepare the corresponding legislative and regulatory texts
SO9 Prepare standard documents for decision-makers responsible for procurement (institutional and public) and maintenance (model terms of reference for service delegation)
Services provided : The services provided are:
Feasibility studies:
Data collection and analysis
Water and sanitation needs assessments
Stakeholder roles and conditions for the sustainability of infrastructure
Analysis of legal texts
Analysis of the legislative and regulatory framework
Preliminary design studies:
Definition of the institutional model
Strategy for the sector's institutional organization
Design of a water and sanitation platform
Tariff studies
Detailed Design Studies:
Definition of the institutional framework
Detailed definition of the institutional framework
Development of an action plan for implementing the institutional reform
Strengthening of the technical capacities of human resources working in the sector, to support the organizational structures
Restitution workshops
Project : Following the 2021 floods in Belgium, the Walloon Region tightened building requirements in areas subject to flood hazards, whether from surface water runoff or watercourse overflow.
Many project developers, architects, promoters, and owners of land and property must now provide additional studies and information in order to obtain their building permits.
Since the entry into force of the Circular on constructibility in flood-prone areas, we have supported our clients on more than a hundred cases, covering private residences as well as major industrial projects and public infrastructure.
Services provided : Percolation tests
Meteorological studies
Collection and analysis of data (topographic, soil, pedological, etc.)
Characterization of the situation
Identification and characterization of protective measures
Development of risk mitigation measures
Consideration of comments from the authorities
Report writing
Defence of files before the authorities
Project : The overall objective of the assignment is:
to improve the living conditions of the country's rural population by increasing the sustainable coverage of drinking water supply services, thereby protecting the beneficiary population from water-borne diseases.
The various services to be provided are:
· Preparation of Detailed Design Studies (DDS) for the rehabilitation of existing structures and the construction of new systems in 2 distinct geographical areas, based on existing Preliminary Design Studies (PDS) covering 250 infrastructures.
· Preparation of Tender Documents for the selection of contractors, for both drilling works and network infrastructure construction works;
· Carrying out the project's Environmental and Social Impact Assessment (ESIA), together with an Environmental and Social Management Plan (ESMP), a General Health and Safety Plan and a Specific Health and Safety Plan;
· Assisting ANAEPMR on technical matters throughout the project;
· Conducting the control and supervision of works.
Services provided : The services provided are:
Detailed Design Studies:
Site reconnaissance
Resource analysis
Geophysical surveys
Water quality
Energy study
Topographic surveys
Borehole tender documents
Drilling and pumping tests
Drafting of the Detailed Design Study
Preparation of works tender documents
Client support
Environmental and Social Impact Assessment
Control and supervision of works
NB: The Preliminary Design Studies should have been prepared before the start of the assignment, but this was not the case. The Consortium therefore began its assignment with the Preliminary Design Studies
Project : The objective of the assignment is to carry out an analysis and assessment of the current state of monitoring and evaluation in the water and sanitation sector in Sudan, including human and physical capacities at the national, state and mahalia (locality) levels, the state of implementation, the institutional situation, and data generation
Services provided : Desk review
Mapping of existing and planned M&E activities
Review of M&E indicators, data collection and management systems
Assessment of sector-wide M&E
Participatory consultation workshop
Preparation of an action plan
Project : The financing agreement for the GIRE2 project was signed in October 2010 between the Niger Basin Authority (NBA) and the Agence Française de Développement (AFD), for a grant amount of €3.4 million. The project's initial duration of 3 years was extended by the same period.
The overall objective of the GIRE2 project was to provide the Niger Basin Authority with the means and skills required to efficiently monitor water resources and major hydraulic structures, particularly the three large dams under study or under construction (Kandadji, Fomi and Taoussa), for their integrated and coordinated management.
Its specific objectives were:
- To durably improve the reliability of hydrological monitoring for forecasting,
simulation and Integrated Water Resources Management in the basin;
- To develop and master the technical, institutional and
legal instruments for the development and Integrated Water Resources Management of the basin and its key hydraulic structures.
Services provided : The main steps carried out during the evaluation were:
- Desk review
- Reconstruction of the project's intervention logic
- Preparation of a detailed project narrative
- Field mission to NBA headquarters and in 4 member countries
- Assessment of project performance according to the following evaluation criteria: relevance, efficiency, effectiveness, impact, sustainability and the added value of AFD's action.
- Development of conclusions and recommendations
Project : The overall objectives of the project were to:
• Reduce the incidence of water-borne diseases caused by poor hygiene;
• Reduce infant mortality and morbidity.
Its specific objective was to improve access to drinking water, the coverage rate of household latrines, and basic hygiene practices for the populations of the municipalities of Petite-Rivière and Verrettes.
The main expected results were:
• Result 1: 22,880 people have sustainable and sufficient access to an improved drinking water source
• Result 2: Access to basic sanitation is improved for the population of the targeted localities
• Result 3: The Haitian Red Cross and the CAEPA (Drinking Water and Sanitation Committees) have strengthened their operational capacities
• Result 4: 60% of the 23,930 targeted people improve their behaviour regarding the use of facilities and basic hygiene.
Lasting 60 months, the project began in April 2011, with a budget of €3,510,215 financed by EuropeAid (Water Facility) and co-financed by French local authorities. The intervention area comprised 6 localities in the municipalities of Petite Rivière and Verrettes.
Services provided : The expected results of the assignment concerned the evaluation of all activities carried out, through a quantitative and qualitative comparison between the objectives and results achieved and the initial forecasts, the identification of lessons learned from the project, and the formulation of recommendations for future actions.
To achieve these results, the Consultant will:
• Analyse the project against the 5 basic evaluation criteria: relevance, effectiveness, efficiency, sustainability/viability and impact;
• Carry out an analysis of accountability towards beneficiaries and of the project's coherence;
• Assess the level of capacity building achieved among local partners;
• Assess the level of visibility of the Haitian Red Cross and the EU;
• Highlight lessons learned from the project and provide recommendations for future interventions.
Project : Evaluation of two Programmes implementing the Reform of the water service management system in Burkina Faso, financed by AFD: the Reform Support Programme and the Water Supply and Sanitation Programme in the Centre-Nord region
Services provided : Desk review of Programme documents and sector strategy and policy documents.
Meetings with sector and Programme stakeholders: line ministries, the Directorate-General for Drinking Water, regional directorates, municipalities, water system operators, user associations, etc.
Site visits to Programme achievements
Evaluation of the Programmes according to the OECD-DAC criteria
Development of specific recommendations for future AFD-financed projects and programmes, as well as general sector recommendations
Project : Formulation of a multi-annual Programme (2016-2020) entitled “Health and Water for Nutrition”, with a total budget of €90 million.
The Programme covers 5 regions in the Health, Water and Sanitation sectors, aiming to combat chronic malnutrition, particularly among young children and pregnant and breastfeeding women.
The Programme includes a component to strengthen governance and budgeting for food and nutrition security, as well as permanent and sustainable access to food available in sufficient quantity and quality.
Services provided : Identification of sector-specific water and sanitation needs in social infrastructure (health centres, schools, bus stations) and in settlements (rural, peri-urban and urban areas).
Assessment of the sector's institutional and organizational framework.
Recommendations for activities.
Drafting of the EU Programme formulation documents.
Project : The overall objective of the project is to ensure the proper execution of works for the construction of water and collective sanitation infrastructure under the PEPAM-EU project.
- Drilling component: construction of 41 new boreholes and rehabilitation of 09 existing boreholes;
- Civil works component: construction of 49 superstructures with elevated water tanks and water supply networks, as well as 305 public sanitary facilities.
Services provided : The services provided under the technical assistance assignment are:
- supervision and control of borehole drilling and piezometer installation works;
- supervision and control of works for the construction of water infrastructure (supply and installation of water supply networks, elevated water tanks and intake structures, electromechanical equipment);
- supervision and control of works for the construction of public sanitary facilities
- collection and formatting of as-built documents for input into database and GIS systems.
Project : The purpose of the assignment was to support the EU Delegation in Togo by providing the elements required for the identification and formulation of the Togo Water and Sanitation Project (PEAT II), financed under the 11th EDF.
PEAT II is an extension of PEAT I to the three regional capitals of Tsévié, Sokodé and Kara, with a forecast budget of €30 million.
The project's intervention framework was defined as follows:
- Increasing the rate of access to drinking water and to collective and household sanitation, and improving solid waste management, through:
i) Construction, rehabilitation or upgrading of water supply systems
ii) Construction of household and communal latrines and sludge treatment
iii) Establishment and/or improvement of comprehensive solid waste management systems
- Strengthening the capacities of public bodies responsible for providing drinking water, sanitation and waste management services
- Institutional and technical support, and capacity building for national stakeholders
Services provided : The services delivered resulted in:
Identification phase:
- An objective assessment of the current policy and sector framework,
- A project profile meeting the EU's and Togo's development objectives under the 11th EDF National Indicative Programme (NIP).
Feasibility and formulation phase:
- Definition of the intervention logic for the water supply, household sanitation and waste management components,
- Definition of the implementation arrangements for the project,
- Definition of the investment requirements,
- Definition of the institutional support components,
- An Action Document (AD) and its annexes (logical framework, implementation schedule, detailed cost estimate…) and the Technical and Administrative Provisions, in accordance with standard European Union formats.
Project : The Millennium Water Programme (PHAM) aims to contribute to poverty reduction and to improving the health of populations in the programme area through access to better basic social services in water and sanitation.
Services provided : The expected results of the mission are:
•The issue of decentralisation of the public drinking water service has been identified.
•The issue of maintenance of rural drinking water infrastructure has been identified.
•Current and potential actors in the rural public drinking water service have been identified.
•A roadmap for the study and approval phase of the study outputs concerning specific objectives 2 and 3 of the institutional support to the domestic water sector has been developed.
Project : The objective of the GIREau programme is to contribute to a balanced water budget in the Tensift river basin.
Accordingly, and in order to enable the ABHT to exercise its function of administering the public water domain and monitoring water resources quantitatively and qualitatively, the modernisation of information systems and measurement and control networks is necessary.
This is the purpose of the present study, which must define a sustainable system for collecting and processing the data needed for the management and regularisation of the water resources of the Tensift river basin.
The measures envisaged include:
•Strengthening the Geographic Information System (GIS) of the Tensift RBA through the establishment of various processes enabling real-time management of water resources (stopping irrigation releases from dams during the rainy season, harnessing flood water, etc.);
•Strengthening the system for monitoring and controlling water abstraction and use
•Improving water resource forecasting systems: forecasting of spring-summer water inflows (snowmelt), flood forecasting, low-flow forecasting, etc.;
•Strengthening the flood forecasting and warning system;
•Strengthening the system for monitoring, controlling and tracking water resources in the Tensift basin, including quality measurement;
•Selection and installation of appropriate piezometers and flow meters in a number of wadis and canals.
Services provided : The results produced by the mission are:
•Collection of information and critical analysis of the current situation regarding: i) surface water, groundwater and meteorological monitoring networks; ii) the flood warning system; iii) existing GIS and databases;
iv) information collected on groundwater and surface water abstraction;
v) information collected on water uses;
vi) information flows: collection, encoding, processing, analysis, reporting;
vii) relationships between the various stakeholders.
•Development, at the pre-feasibility level, of a conceptual project schedule comprising: the development of technical and organisational proposals; overall project planning; the definition of a preferred option; the design of the measures and the chosen concept;
•Development, at the feasibility level, of a project schedule comprising: an implementation plan; cost estimation; management of cross-cutting measures and improvement recommendations; the holding of a workshop and preparation of the feasibility study.
Project : In December 2006, Burkina Faso adopted the National Drinking Water Supply and Sanitation Programme (PN-AEPA) with a 2015 horizon. The PN-AEPA, with a 2015 horizon, has the overall objective of halving, by 2015, the proportion of people without adequate access to drinking water and sanitation compared with 2005, according to the standards, criteria and indicators adopted in this area.
In anticipation of the end of the PN-AEPA (2015), the MEAHA deemed it necessary to prepare a programmatic document for the coming years.
It is within this context that the present assignment to develop a post-2015 Drinking Water Supply Programme (AEPA) with a 2030 horizon takes place.
Services provided : The overall objective is to develop, through a consultative and participatory approach, a National Drinking Water Supply Programme (PNAEP) with a 2030 horizon, enabling Burkina Faso to achieve the objectives it has set in this area.
The PNAEP will operationalise the new "National Water Policy" document currently being finalised, in particular with regard to:
-its foundations, objectives and principles;
-its strategic orientations and new priorities, notably those developed within the framework of the Sustainable Development Goals (SDGs)
-other recent developments to be taken into account.
The specific objectives of the assignment are:
i. To take stock of drinking water supply in Burkina Faso (baseline situation)
ii. To define proposed objectives and strategies;
iii. To propose a coherent and relevant investment plan to ensure the development of the water service;
iv. To develop an operational action plan consistent with the orientations defined by the programme budget;
v. To propose the full set of accompanying measures needed to ensure the success of the programme (resource mobilisation strategy, communication plan, environmental and social management plan, monitoring and evaluation system);
vi. To propose the programme's governance framework;
vii. To develop the National Drinking Water Supply Programme with a 2030 horizon.
Project : The BTC's institutional and operational support project to the three river basin agencies (A3ABH) in Morocco covers the three RBAs of Souss-Massa-Drâa, Loukkos and Moulouya.
The project aims to operationalise Law 10-95 on Water and the National Water Strategy (SNE) by defining five results:
• Result 1: "The presence of the RBAs at local level is strengthened."
• Result 2: "The mechanisms, procedures and tools of the RBAs support effective management of information and resources."
• Result 3: "The RBAs have an integrated database on water resources and their use that meets their needs and the expectations of their partners."
• Result 4: "The RBAs are better able to manage the public water domain."
• Result 5: "The preservation of water resource quality is taken into account in the RBAs' actions."
Services provided : The main tasks assigned to the "Baseline" mission were as follows:
1. Establishment of the baseline situation for the A3ABH project's area of intervention.
2. Review and adaptation of the logical framework of the Technical and Financial File (DTF).
3. Review of the indicators proposed in the DTF and proposal of additional indicators.
4. Definition of baseline and target values for these additional indicators (as well as intermediate values, where realistic).
5. Proposal of an M&E system for the project and modalities for collecting, processing and interpreting information.
6. Preparation of a risk management plan for the processes concerned by the A3ABH project.
Project : The overall objective of the assignment was to provide SP-EAU and TdE with a hydraulic simulation tool for their drinking water networks, enabling standardised and effective planning and management of their
networks.
The specific objective of the assignment was to establish hydraulic simulations (hydraulic models) for the 5 regional capitals of Tsévié, Atakpamé, Sokodé, Kara and Dapaong selected under the implementation of PEAT 1.
Services provided : The Consultant's assignment was carried out in 3 main phases:
- a data collection phase, involving processing of the data and additional field studies needed for the hydraulic modelling of the drinking water networks of the 5 centres;
- a phase for establishing and delivering the 5 hydraulic models (EPANET) based on the data collected on the existing networks, taking into account their shortcomings;
- a phase involving, on the one hand, briefing on the usefulness and use of these models for SPEAU/TdE Headquarters and the 5 TdE regional directorates (15-20 people), and, on the other hand, training on the operation, monitoring and further development of the models provided.
Project : Following the overflow of two watercourses, a residential area was flooded.
The firm was commissioned to identify the causes (internal and external) of the flooding and to propose technical solutions to prevent a similar event.
Services provided : Topographic survey, hydrological study, analysis of sewer network plans, watercourse modelling.
Project : Preparation of terms of reference covering primarily the phasing of the studies to be carried out, the prerequisites, support for commissioning the existing wastewater network and enabling its diagnosis, the baseline assessment and diagnosis for stormwater drainage, and a schedule for carrying out the full set of studies required to update the Master Plan.
Services provided : The services covered:
a. Meetings with the various stakeholders
b. Review of the mapping systems already in use, database type, operators in place and their operating capacity
c. Review of current key issues relating to wastewater and stormwater drainage, flood-prone areas, sedimentation, etc.
Project : Formulation of 6 co-financing projects between the GEF and the AfDB in the field of natural resource conservation and energy efficiency in the Lake Chad region.
The programme comprises six projects: 5 at national level and one at regional level.
The five national-level projects are based on the areas of limiting and restoring land degradation, mitigating climate change and conserving biodiversity in the Lake Chad basin.
The regional project is based on improving water governance and water use efficiency.
The LCB-NREE programme is a regional priority owing to the transboundary nature of the lake basin and the need for concerted efforts to address the challenges of conserving the basin's water and ecosystems while ensuring food and energy security for the basin's populations.
Services provided : This mission enabled the collection of baseline data and the definition of biodiversity conservation and natural resource management activities. It provided the basis on which the six large-scale projects were developed, so that strategies and measures could be implemented. The PPG phase is essential in order to identify and refine the measures envisaged and to ensure that the project and programme comply with the guidelines of the GEF Trust Fund.
The programme's four components were as follows:
1 / Promoting transboundary water governance, efficient water use and sustainable livelihood strategies
2 / Conservation of ecosystem goods and services
3 / Mobilisation of knowledge on wetland biodiversity and water resources
4 / Monitoring of surface water quality and quantity, and exploration of groundwater resources.
Project : The Sud-Kivu, Maniema, Kinshasa East and Lemba-Patu drinking water supply and sanitation project, funded by the DGD, was launched in January 2007.
The overall objective of this project was to improve the living conditions of rural and peri-urban populations by providing them with sustainable access to drinking water and sanitation. The project aimed to establish small, autonomous drinking water supply networks managed by users, organised within an association.
Services provided : For scheduling and budgetary reasons, the evaluation covered only the achievements in Sud-Kivu and Kinshasa East, with the following results:
- taking stock of the achievements of two bilateral projects in Sud-Kivu and Lemba Patu, in the field of water supply and sanitation (AEPA)
-determining the degree of achievement in relation to the objectives set and expected results
- reviewing the management of these projects
- identifying the constraints and problems encountered during implementation.
Project : Support mission for the appraisal of the Guangyuan drinking water production and distribution project (100,000 m³/day)
Services provided : Site visits of the water intake and treatment plant locations
Analysis of the treatment plant design: proposed processes, sizing of the plant's main components
Technical-economic analysis of options for the intakes and pumping stations
Technical-economic analysis of options for raw and treated water transmission pipelines
Identification of environmental and social risks
Project : Supervision of the installation of two water treatment plants and the construction of two surface water storage dams in the villages of Vailele and Aleisa (Samoa).
Services provided : 1) Modelling and construction of river water storage structures
2) Installation of the raw water pipeline and connections through unpopulated areas
3) Installation of the two treatment plants
a. Chemical dosing units
b. Flocculation units
c. Sedimentation units
d. Installation of rapid sand filters (60m3/h)
4) Installation of prefabricated reservoirs (250 m3)
5) Construction of access roads
6) Commissioning of the water treatment plants (chemical calibration, tightness and pressure testing, etc.)
7) Training of operators and assistance with preparing as-built drawings of the completed structures
Project : The overall objective of this assignment was to evaluate the impact and sustainability of the programme's components with regard to its purpose, objectives, results, activities and resources.
The final evaluation was to examine whether the programme's components achieved their objectives. The review was also to identify lessons learned in order to improve the consistency between the needs and capacities of the water and sanitation sector, with a view to improving policy formulation for the 11th EDF, for which water
will remain a focal sector.
Services provided : The consultant was required to provide the following services:
The review provided specific information on the sustainability of the programme, expressing critical and impartial opinions on the extent to which the programme was able to achieve its objectives. It also assessed the effectiveness of the monitoring system in place and the quality of the indicators used overall.
The review resulted in:
1. An assessment of the problems identified and the projects' objectives against their physical and policy environment;
2. An assessment of the projects' monitoring and control arrangements and the indicators adopted;
3. An assessment of whether and how cross-cutting issues were adequately taken into account;
4. An assessment of the sustainability of activities and results;
5. Whether best practices were adopted in response to problems encountered and whether the right questions were asked during the programme;
6. Identification of useful lessons to be drawn for future interventions and support to the sector.
Project : Support to the Ben Tre Provincial Water Company (CEP), in the Mekong Delta, in conducting an international design-build tender for a 15,000 m³/day surface water treatment plant, including an intake structure and raw water pipeline, as well as support to the CEP throughout the related procurement process.
Services provided : Analysis of the tender documents
Mission to support the CEP with the opening and analysis of the non-financial bids
Analysis of bids and questions to bidders
Suggestions regarding negotiations with bidders
Contractual and technical suggestions concerning the second stage of the tender
Project : The objective of the study was to carry out the "basic engineering" of two hydroelectric facilities on the Rutshuru and Luviro rivers in Virunga National Park and to calculate the economic profitability of these projects.
Services provided : • Measuring the characteristics (flow rate, height, width, velocity, head, annual variations, etc.) and the energy potential of the two rivers,
• Analysing current and future energy needs of consumers,
• Carrying out topographic surveys,
• Sizing the various structures: water intake, headrace canal, turbine, powerhouse, etc.
• Defining a construction budget.
Project : Following the success of Phase 1 of the PHVP, the Government of Niger requested and obtained financing from the Belgian Government for a second phase.
In order to optimise financial resources and take into account the new administrative divisions and the interventions of other donors, this project will focus on 2 departments of the Region: Dogondoutchi and Tibiri
Services provided : Analysis of sector developments, national policies and strategies
Taking into account the achievements of Phase 1
Taking into account the interventions of other donors
Definition of synergies with other projects (BTC and other donors)
Definition of a strategy
Operational planning
Budget framework
Definition of the logical framework
Drafting of the Technical and Financial File
Project : Formulation of the PIC III component supporting national execution in the water and sanitation (W&S) sectors. In collaboration with the national party, defining the main orientations (partner institutions, geographic areas, methodology, operating modalities) and drawing up the logical framework, results, activities, budgets and planning. Diagnosis in terms of needs, approaches and feasibility, strengthening of the management and steering capacities of ministries and national services, support for decentralisation and for organisations managing the upkeep and servicing of water points.
Services provided : Responsible for the participatory formulation of the W&S component of PIC III: diagnosis, national workshops, feasibility report, then formulation of support for national execution
Project : The overall objective of this project will be: food security in the northern part of Equateur Province is improved through better access to sustainable basic drinking water services and improved sanitary conditions.
The specific objective will be: the achievements of the first phase of the project in terms of access to drinking water are sustainably consolidated, with autonomous management of the maintenance/upkeep of water points, and provide support to the beneficiaries' food security.
Services provided : Drafting of the project document, including the logical framework, budgeting and planning.
Project : The overall objective of this project was: the living conditions of the population of Sainte-Suzanne (commune in North-East Haiti) are sustainably improved.
The specific objective was: the inhabitants of the communal sections of Sainte-Suzanne have sustainable access to drinking water, in sufficient quantity and under the best possible conditions.
The project began in November 2008 for a duration of 4 years. It was funded by CCFD-Terre Solidaire, MAEE, Manos Unidas and the beneficiary populations. It was implemented by the Haitian NGO CONCERT-ACTION.
The main expected results of the project were:
R1: The population is made aware of the importance of drinking water for hygiene, health and quality of life in general.
R2: Drinking water is available from 55 small distribution systems.
R3: A local structure for managing family contributions and facility maintenance is operational.
R4: The protection of drinking water distribution systems is strengthened.
Services provided : The results of the mission concerned the evaluation of progress achieved at the sector level, a comparison in quantitative and qualitative terms between the objectives and results achieved and the forecasts, the identification of lessons learned from the project, and the determination of replicable elements of the implementation approach.
Project : Since 1993, Secours Catholique has supported the Bukavu Diocesan Bureau (BDD) and Caritas Goma in implementing drinking water access programmes, mainly in rural areas.
In total, 5 water supply networks, close to 3,000 drinking water sources and 1,080 household latrines have been developed in the North and South Kivu regions, along with the establishment of management committees and the awareness-raising/training of beneficiaries on hygiene and sanitation promotion and the operation and maintenance of water points.
Services provided : The evaluation consisted of:
- measuring the evolution of local partners' practices and of Secours Catholique's support in implementing the programmes,
- highlighting changes in the efficiency of achievements, beneficiary consultation, needs and site identification, the level of ownership and participation of beneficiary populations, and technical progress recorded in the construction of facilities.
- assessing the level of harmonisation/coordination/complementarity of the two organisations' activities with other stakeholders in the sector
- proposing a more advanced strategy in the field of hygiene and sanitation and the strengthening of water point management committees
- proposing a strategy to encourage greater involvement of the Congolese authorities in the monitoring and maintenance of facilities.
Formulation Study for a Project to Improve Access to Drinking Water, Hygiene and Sanitation in the Maritime Region of Togo
Water Supply and Sanitation (WS)
Project : The overall objective is to accelerate progress in Togo towards achieving MDG 7c, Access to Drinking Water and Sanitation Services, and to help accelerate progress on MDG 1c (food security), MDG 4 (under-five child mortality), and MDG 5 (maternal health).
The specific objective of the study is to define a viable project for the provision of drinking water and sanitation for 350,000 inhabitants in semi-urban areas of the Maritime Region of Togo.
Services provided : The formulation assignment consisted of:
- Analysing the programme identification report, including the feasibility of its implementation.
- Proposing and validating the criteria for selecting beneficiary localities.
- Establishing and validating the indicative list of localities eligible to benefit, according to the criteria adopted.
- Producing a preliminary estimate of water service costs.
- Proposing a management system for small-scale piped water supply systems (mini-AEP).
- Examining the relevance and feasibility of the Community-Led Total Sanitation (CLTS) approach, complemented by social marketing.
- Identifying potential operators for the various types of works and services planned.
- Analysing the programme's implementation capacity and the sustainability of water/sanitation infrastructure and services, assessing the capacity-building needs of the main stakeholders, and proposing the actions to
be planned during the operation.
- Proposing a programme formulation. - Preparing the Action Fiche, technical and administrative provisions (DTA) and terms of reference for the technical assistance.
Project : Panpangou:
The Panpangou agro-pastoral development scheme consists of: i) a reservoir with a capacity of 700,000 m3, whose dam is built from compacted clay fill; ii) an irrigated area of approximately 20 ha downstream of the reservoir.
In July 2008, an exceptional flood swept away the dam's emergency spillway and caused damage within the irrigated area. Iles de Paix decided to rehabilitate the dam and the irrigated area, and to carry out an extension of the area, which requires raising the dam to increase the reservoir's capacity.
Bénéna ford / Fangasso track:
As part of its collaboration with local municipal authorities, Iles de Paix was asked to develop a 1.7 km track section at Fangasso and to rehabilitate a ford located on the Bénéna-Mandiakuy road.
The objective of this detailed pre-project study is to define the technical conditions for constructing these crossing structures requested by the municipal authorities.
Bénéna floodplain:
Since 2007, Iles de Paix has been carrying out an intervention in the Tominian district. One of the actions defined in 2009 aimed at developing a lowland floodplain of approximately 15 hectares for rice cultivation, benefiting about forty producers from the village of Bénéna. A detailed design study (APD) was then carried out internally in 2010, proposing a gated concrete regulating structure at the entrance to the floodplain.
Services provided : Panpangou: Preparation of the detailed design (APD) file: i) design, sizing and hydraulic calibration of the dam and ancillary structures (emergency spillway, stilling basin, discharge channel); ii) design and sizing of the rehabilitation and extension of the irrigated area; iii) cost estimation. Preparation of the tender documents (DAO).
Bénéna ford / Fangasso track: The services involved developing, at detailed design (APD) level, the technical studies for the execution of the works. In addition to the topographic survey, the services covered: i) the design and calibration of the fords and/or other structures, after review of the geotechnical study; ii) the assessment of work quantities and an estimate of investment costs
Bénéna floodplain: i) processing of raw topographic data to produce a digital terrain model; ii) review of the hydrological and design flood studies; iii) verification of the design and sizing of the structures presented in the existing APD report; iv) design, sizing and calibration of the structure for an alternative development option, after review of the geotechnical study; v) assessment of work quantities and an estimate of investment costs; vi) preparation of the detailed design (APD).
Project : Since 2007, Îles de Paix has been carrying out an intervention in the Cercle of Tominian, specifically in the Commune of Bénéna. One of the activities defined in 2009 aimed to develop a lowland floodplain of approximately 15 hectares for rice cultivation, benefiting around forty producers from the village of Bénéna.
A detailed design (APD) study was then carried out in-house in 2010, proposing a gated concrete regulating structure at the entrance to the floodplain.
The consulting firm HYDRO-R&D International was asked to review this APD and, if possible, propose alternative options. This new APD study is therefore the result of an analysis based on the initial study and existing data, aimed at optimising both the development of the floodplain and the investment required.
Services provided : The services covered:
• processing of raw topographic data to produce a digital terrain model;
• review of the hydrological and design-flood studies;
• verification of the design and sizing of the structures presented in the existing APD report;
• the design, sizing and setting of the structure for an alternative development option, following verification of the geotechnical study;
• the assessment of works quantities and an estimate of investment costs;
• preparation of the APD report and drawings for the most advantageous solution.
Project : The development objective of PEAMR was to increase the availability and sustainability of drinking water supply and sanitation (AEPA) services in rural areas. The
specific objectives include: (a) establishing demand-responsive and sustainable AEPA infrastructure by promoting simple water supply and sanitation systems that are planned, managed and maintained by communities with private-sector support in selected districts; (b) strengthening community capacity to plan, implement and manage services, and training community members in better hygiene practices; (c) strengthening the capacity of administrations, districts, users and the private sector to take on roles consistent with the new water sector strategy; and (d) mobilising community support for the rehabilitation/expansion of the Mayaga-Bugesera system and its operation by the private sector.
Services provided : The objective of the Audit was to enable the Government, the districts and the donors to form an opinion on the effectiveness of implementation, the achievement of expected results, and the transparency of the investments entrusted to the districts and to the UEA.
The audit notably verified that all investments were implemented in accordance with the provisions of the applicable financing agreements; the quality of the technical studies, and the compliance and quality of the study files (preliminary design, detailed design, execution files); that the planned training services had been provided; the compliance of the works; the execution timelines; etc.
Final Evaluation of the "Upgrading of the Drinking Water Programme as an Integrated Component of the CDI-Bwamanda Comprehensive Development Programme" Project, and Pre-Formulation of the Project's Second Phase
Water Supply and Sanitation (WS)
Project : The "Upgrading of the Drinking Water Programme as an Integrated Component of the CDI-Bwamanda Comprehensive Development Programme" Project is co-financed by the Belgian Survival Fund and CDI-Bwamanda - Belgium.
Its overall objective was to improve the health of the population of North Equateur.
Its specific objective was to achieve sustainable improvement in access to drinking water and in hygiene/sanitation behaviour.
The assignment comprised two distinct phases:
i) Final evaluation of the project, analysing the criteria of relevance, efficiency, effectiveness, sustainability and impact;
ii) Pre-formulation of the project's second phase: participatory development of the logical framework and budgeting during a formulation workshop with the project's various stakeholders.
Services provided : The main objective of the evaluation was to assess the extent to which the project's objectives had been achieved.
The following five criteria were analysed: relevance (reduction of food insecurity), effectiveness, efficiency, impact and sustainability.
Project : In 2010, Îles de Paix launched a second intervention in the Cercle of Tominian, specifically in the Commune of Fangasso. This commune is located in the north-west of the cercle. It comprises 41 villages spread over an area of 1,200 km2 and has a population of 19,301 inhabitants (1998 census). The communal seat, Fangasso, is located approximately 45 km from Tominian, the cercle's administrative centre.
As part of its collaboration with the local communal authorities, Îles de Paix was asked to develop a 1.7 km track section at Fangasso and to rehabilitate a ford located on the Bénéna-Mandiakuy road.
The objective of this detailed design study was to specify the technical conditions for constructing these crossing structures requested by the communal authorities. Specifically, at Fangasso, the study produced a technical memorandum justifying the technical choice of the proposed works.
Services provided : The services covered the development, at detailed design (APD) level, of the technical studies for the execution of the works. Economic and financial analysis, as well as the environmental impact assessment, were not addressed at this APD stage.
More specifically, the technical studies covered topography. The geotechnical study (whose terms of reference were proposed by the Consultant) was carried out by a local service provider, in parallel with the topographic surveys.
The services then covered:
• the design, sizing and setting of the fords and/or other structures, following verification of the geotechnical study;
• the assessment of works quantities and an estimate of investment costs;
• the production of the detailed design (APD) report and drawings.
Following the proposed technical solution for developing the track through the low-lying area of Fangasso village proving too costly for Îles de Paix, an addendum was drawn up to propose other, more economical development options.
Final Evaluation of the 5th Multi-Annual Micro-Projects Programme (PPMR)
Water and Rural Development (WS/AG)
Project : The evaluation provided the Togolese Authorities and the European Union with analyses and recommendations relating to the design, institutional framework, operation, results and achievements of the 5th PPMR. In formulating its recommendations, the evaluation paid particular attention to the impact and sustainability of the activities carried out under the programme, proposing possible measures. Recommendations were also given with a view to improving the effectiveness of any future European Union support in this area.
The evaluation was conducted using a participatory approach involving stakeholders and beneficiaries at all levels.
Presentation and discussion sessions on the interim results obtained were organised, and progress reports were produced in accordance with the adopted work plan.
Services provided : We produced an evaluation of the quantitative and qualitative aspects, the implementation approach, and the relevance, effectiveness, efficiency, viability and ownership of the programme.
The evaluation resulted in recommendations aimed at improving the effectiveness of any future EU support in the sector.
The following aspects were evaluated:
· achievement of the Programme's objectives listed above;
· the relevance, effectiveness and efficiency of the methodology and implementation approach used;
· the organisation and operation of the programme;
· the programme's impact on beneficiaries;
· ownership and sustainability of the programme;
· the support provided by the Technical Assistance team
Kavango/Caprivi Regional Rural Water Decentralisation (NAM/345 project) – Mid-term evaluation
Water Supply and Sanitation (WS)
Project : The "Kavango/Caprivi Regional Rural Water Decentralisation" project (2008-2010) aimed to improve access to drinking water for rural communities in the Kavango and Caprivi regions and to reduce the incidence of waterborne diseases through the establishment of efficient decentralised Regional Directorates coordinating water supply and sanitation. The expected results were: Result 1: support the decentralisation of rural water supply in Kavango and Caprivi from a strategic and operational standpoint; Result 2: facilitate the efficient implementation of Regional Rural Water Supply Development Plans in Kavango and Caprivi and ensure they are efficiently supported by local administrations and empowered communities. The number of beneficiaries was approximately 260,000.
Services provided : The main objective of the assignment was to carry out a mid-term evaluation of the NAM/345 project. In this context, the team analysed:
-the results and specific objectives achieved at the time of the evaluation, compared with what had been planned;
-the results achieved in terms of capacity development;
-project management and monitoring;
-the evaluation criteria (relevance, effectiveness, efficiency, sustainability) and cross-cutting aspects (poverty reduction, good governance, gender and environment).
The experts identified lessons learned and formulated recommendations for the remainder of the project.
Project : VRES operates in the Mopti Region. It was designed to help ensure food security following the severe drought years that struck the Sahel countries in the 1970s and 1980s.
VRES began in 1989 and was implemented in three phases through to the end of 2008.
The activities of the VRES Project were based mainly on rice, market-garden and forestry production within irrigated schemes developed with full water control through pumping. 2,450 ha of small village-scale irrigated schemes were thus developed (approximately 120 schemes).
Complementary activities were also carried out to build producers' capacity and increase their incomes (fish farming, beekeeping, microcredit, etc.).
Services provided : The assignment forms part of the process of capitalising on the achievements of 19 years of VRES interventions. Drawing on the perspective offered by this long period of intervention, it was intended to produce a critical assessment of the approaches and results, which could be drawn upon by both the European Commission and other stakeholders in the field of rural development.
The first objective of the assignment was to draw up an assessment of the interventions carried out during the three phases of VRES, and to produce educational summaries focused on lessons learned.
The second objective of the assignment was to produce, on the basis of the capitalisation of VRES experience, decision-support tools enabling ex-ante comparative assessment of the usefulness and sustainability of future small irrigated schemes with full water control.
Review Study of Achievements by Municipalities under Resource Transfer, and by AGETEER and FEER under Delegated Project Ownership from the DRAHRH
Water Supply and Sanitation (WS)
Project : Burkina Faso developed a National Drinking Water Supply and Sanitation Programme (PN-AEPA) with a 2015 horizon, adopted by the Government in 2006. The programme's overall objective is to improve the quality of life of the rural and urban population by ensuring equitable and adequate access to drinking water and sanitation by 2015, within a framework of sustainable and balanced water resource management. At the central level, the rural Drinking Water Supply and Sanitation (AEPA) sector in Burkina Faso is led by the Ministry of Agriculture, Water Resources and Fisheries. In urban areas, the National Water and Sanitation Board is responsible for developing the AEPA sector. At the regional level, government AEPA policy is coordinated by the Regional Directorates of Agriculture, Water Resources and Fisheries (DRAHRH).
The transfer of project-ownership responsibilities to rural municipalities, initiated in 2009, forms part of the PN-AEPA implementation strategy. In 2010, the first support agreements for PN-AEPA/PAGIRE were implemented through sector budget support. Under this framework, several DRAHRH signed Delegated Project Ownership agreements with FEER and AGETEER for the execution of investment credits. To date, the actual use of these funds, in terms of achievements and execution rates, is not well known.
Services provided : The general objectives of the study were to:
i) Review the agreements signed between the two agencies (FEER and AGETEER) and the Regional Directorates of Agriculture, Water Resources and Fisheries (Boucle du Mouhoun, Centre, Hauts-Bassins, Nord, Sud-Ouest, Centre-Est) that benefited from investment credits in 2010.
ii) Review the achievements of municipalities under the resource transfers they received from the State in 2009 and 2010 for the rehabilitation of hand-pump boreholes (PEM).
Project “Technical Support to Water Trade Training Centres” in Algeria – ALG 04 008 11 - Mid-Term Evaluation
Water Supply and Sanitation (WS)
Project : The “Technical Support to Water Trade Training Centres” Project, co-financed by Algeria and Belgium, began operations in September 2005. Following an extension, the project's completion date was set for December 2011.
Its specific objective is as follows: “Sector professionals are trained at a water trade training centre”.
The expected results are:
•R1. Rehabilitation, extension and equipping of the training centre are completed
•R2. Training of trainers and centre managers is provided
•R3. The Centre is organised from a pedagogical standpoint
•R4. The proper functioning of the centre and of the training courses is ensured.
The mid-term evaluation took place after 65 months of project implementation.
Services provided : The purpose of the mid-term evaluation mission, carried out by the consultant, was to “ensure that the project's progress and performance would enable it to achieve its planned objectives and results”.
The outputs of the mission were as follows:
•An analysis of the project's strategy in relation to its logical framework.
•An assessment of the Project's performance, functioning and organisation against the standard criteria: relevance, efficiency, effectiveness, sustainability, impact.
•An analysis based on the HARMO criteria: harmonisation, alignment, results-based management, mutual accountability, ownership.
•An assessment of how cross-cutting themes were taken into account: gender equality, environment.
Project : For many years, the French Development Agency (AFD) has been engaged in financing drinking water supply projects in rural and semi-urban areas of West Africa, and Mali in particular.
AFD's commitments have amounted to several million euros annually. Several major projects and studies have been implemented over the years, notably the following financing agreements and projects:
> Village Water Supply Project in the 3rd, 4th and 5th Regions of Mali,
> Project for the construction of 21 water supply systems in the Nioro and Diéma districts,
> Feasibility study for a rural and semi-urban water supply project in the Mopti, Gao and Timbuktu regions,
> South Mali Project Phase I, construction of the Fana water supply system and 12 rural and semi-urban centres,
> South Mali Project Phase II, construction of water supply systems for 10 rural and semi-urban centres in the 3rd Region,
> Drinking water supply project for 18 municipalities in the Mopti region.
The two projects selected for this audit are the "21 Water Supply Systems, Nioro and Diéma" project, for an end-of-project audit, and the "South Mali Phase I and II" projects, for a mid-term audit.
Services provided : The project covers the Nioro and Diéma districts located in the 1st Region. It involved the construction of drinking water supply works in 21 municipalities, as well as the implementation of accompanying measures intended to ensure the proper functioning of both the facilities and the organisations put in place.
The project audit was divided into two parts:
- assessment of project implementation;
- assessment of project impacts.
The Consultant carried out a first-level audit in the 21 municipalities covered by the project, then conducted an in-depth audit in 4 of these municipalities.
Regarding the SOUTH MALI PROJECT PHASES I and II, the Consultant's analysis made it possible to assess the potential need for a reorientation or redefinition of objectives. In this respect, the audit examined how realistic the expected impacts were, and the adequacy between these objectives and the resources mobilised or planned to be mobilised. Particular attention was paid to the relevance of the planned accompanying actions, both those relating to information and training for water point management and those aimed at involving municipalities as future project owners of the water infrastructure put in place (support for decentralisation). The audit paid particular attention to the sanitation component.
Project : The Kidal region, located at the heart of the Sahara, is characterised by particularly low and highly erratic rainfall, concentrated in the months of July to September (rainy season). Vegetation resources, although well adapted to drought conditions, nevertheless have growth and productivity limited by the erratic nature of rainfall.
The distribution of water points and the herds' capacity to move render certain grazing areas inaccessible, while in many other areas overgrazing is a recurring problem, especially near permanent water points.
Better knowledge of the actual water and pasture resources is therefore essential to enable a more rational distribution of water points and a better distribution of livestock across all available grazing land.
This study aimed to achieve a better understanding of the actual situation, as well as to produce satellite-based maps that could serve as decision-support tools for the construction of new water infrastructure (boreholes and wells).
GIS training was also organised at the end of the study to provide Kidal's various technical services with the tools needed to edit and update the GIS system provided.
Services provided : The objective of the study was to assess the forage resources available in the Adrar and in the Tilemsi and Tamesna areas, and to determine the carrying capacity of the rangelands.
The study was carried out in five successive stages:
1. Data collection and pre-processing, comprising the analysis of existing databases, the ordering and processing of satellite imagery (NDVI, infrared, near-infrared, etc.) and a literature review.
2. Given the precarious security situation in the region, two national experts (a water engineer and a botanist) were trained during the planning of the field phase to brief them on the information to be gathered during the field mission.
3. Following a workshop to validate the field mission programme with representatives of local herders, the field mission was carried out, enabling the water and pasture inventories to be completed.
4. Processing of field data and observations in GIS form enabled the production of orthophoto maps.
5. The presentation of results at a workshop and GIS training for staff of the local technical services ultimately provided the tools needed to update the databases created.
Mid-Term Evaluation of the "Bugesera Rural Economy Development" Project (Project RWA 022)
Agriculture and Rural Development (AG)
Project : The RWA/022 "Bugesera Rural Economy Development" Project is an integrated project aimed at both increasing and diversifying agricultural production in Bugesera and improving its marketing, mainly towards Kigali.
The Project's overall objective is to "help improve food security, contribute to poverty-reduction efforts, and contribute to the economic development of the Bugesera Region."
The Project's specific objective is to increase, secure and diversify agricultural production and improve the incomes of Bugesera farmers.
There are 3 expected results:
1/ 240 ha of land are sustainably farmed under irrigation. The Project carries out development works for sprinkler-irrigated schemes and supports the establishment and operation of irrigators' cooperatives.
2/ The productivity of the farming systems of 750 members of Agricultural Promotion Groups is increased. The Project promotes micro-projects in various agricultural sectors (livestock, crops) and supports the construction of individual rainwater-harvesting tanks.
3/ The Bugesera agricultural economy is better integrated into the national economy. The Project carries out the rehabilitation of 2 tracks, totalling 27 km, and the construction of two covered markets.
Services provided : Mid-term evaluation of Project RWA 022 on behalf of Lux Development.
- Analysis of the results and specific objectives achieved compared with what was planned in the Project document.
- Description of the coverage area and beneficiaries of the Project.
- Analysis of Project management and monitoring.
- Analysis of the Project against the evaluation criteria (relevance, effectiveness, efficiency, sustainability), taking into account cross-cutting themes (poverty reduction, democratic governance, gender, environment).
- Lessons learned and recommendations for the remainder of the Project.
Project : The objective of the assignment was to support Benin in the definition, implementation and monitoring of all activities relating to the agricultural sector and food security, and more specifically to provide support for sector programmes already under way or to be launched under the 9th and 10th EDF, as well as outside the EDF framework.
Services provided : The experts' tasks consisted of:
•Proposing work schedules for the various topics covered (sector strategy, cotton value chain, etc.)
•Taking part in discussions, analyses and deliberations on matters within their remit
•Contributing to the drafting of various reports, notes and evaluation or sector-analysis memoranda, and to the drafting of documents relating to programmes to be financed by the European Commission, in accordance with the agreed templates and procedures
•Strengthening the operational monitoring of the implementation of ongoing sector programmes/projects, in particular the Benin cotton value chain support project (Sector Budget Support)
•Monitoring the finalisation and approval of 10th EDF projects and any operations outside the EDF framework, and, where applicable, providing support for the start-up of their implementation
•Supporting Beninese sector institutions and the European Commission in the various dialogue forums between development partners and the Government, including dialogue with the Bretton Woods Institutions (IBW), etc.
Project : The Panpangou agro-pastoral development scheme comprises:
- a reservoir with a capacity of 700,000 m3, with a dam embankment built from compacted clay fill;
- an irrigated area downstream of the reservoir of approximately 20 ha (lined primary canals, secondary canals, drainage channels).
The works were completed in 2007. In July 2008, an exceptional flood destroyed the dam's emergency spillway and caused damage within the perimeter.
After diagnosing the causes of the dam failure and assessing the site's potential, Iles de Paix decided to rehabilitate the dam and the irrigated perimeter, and to extend the perimeter, which requires raising the embankment to increase the reservoir's storage capacity.
Services provided : Preparation of the detailed design (APD) file:
-design, sizing and hydraulic calibration of the embankment and ancillary structures (emergency spillway, stilling basin, discharge channel);
-design and sizing of the rehabilitation and extension of the irrigated perimeter;
-assessment of works quantities and cost estimation.
Preparation of the tender documents (DAO) for the execution of the works.
Project : The Geospatial Information Centre (CIG) provides information for hydrogeological studies and borehole drilling for the water supply of MINURSO (the United Nations Mission for the Referendum in Western Sahara). Given the arid climate and unfavourable hydrogeological conditions in the project area, detailed preliminary studies and a geophysical exploration campaign are required to improve the success rate of productive boreholes.
Services provided : Consultancy services in hydrogeology and geophysics for groundwater exploration in arid environments. Provision of expertise to the CIG Centre during preliminary studies and during the processing and interpretation of geophysical data collected in the field.
Technical Assistance – Institutional Support to the Water Supply Sector in Southern Grenada
Water Supply and Sanitation (WS)
Project : The European Union (EU) provided a grant for technical assistance (TA) under the 9th European Development Fund (EDF) for water sector reform aimed at improving the water supply of the southern part of the island of Grenada.
The overall objective is to improve the performance of NAWASA (the national water and sewerage authority) so that it is able to fulfil its mandate and exceed the expectations of its stakeholders. This involves establishing institutional, commercial and financial arrangements to improve water and wastewater management in Grenada.
Services provided : Preparation of:
- An organisational structure report incorporating the policy and organisational structure changes recommended for NAWASA;
- an organisational plan with detailed work plans and schedules for implementing the report's recommendations;
- a performance management system;
- Human Resources Policies and an Employee Guide;
- a training plan.
Development of financial management capacity.
Development of customer relations.
Development of operations and maintenance capacity.
Development of engineering capacity.
Improvement of the sector's database (leak detection, existing systems, etc.).
Technical Assistance to the ISPA Water and Sanitation Project for the Botosani Region, Data Management Component
Water and Environment (WS/EV)
Project : The project aims to establish a comprehensive assessment of water resources and water use in the Botosani Region, in north-eastern Romania.
As part of the infrastructure upgrade to meet European standards for new member states, the project proposes a rationalisation of resource use, while maintaining an acceptable level of service within the Union.
Investments are proposed for water intakes, treatment, transport, storage and distribution, taking into account local technical and financial capacities.
The project led to the development of a GIS for monitoring drinking water supply and sanitation infrastructure in the town of Botosani and all towns and villages in the Region.
Including a link to network modelling software and user training
Services provided : Data collection
Data processing
GIS development
Network modelling
Design of a decision-support tool
Project : The objective of the study was to determine the relevance of establishing a water supply network for the business park (PEA), based both on the water needs (quantity and quality) of the companies located in the PEA and on the water resources available in the vicinity of the park.
The assessment of water resources comprised two main activities:
- An inventory of water resources and their physico-chemical characterisation.
- A hydrogeological study, based on modelling, to determine the capacity of the aquifer and assess the potential impact of abstraction on the piezometric level.
Hydro-R&D International was tasked with developing a mathematical hydrogeological model to simulate the behaviour of the aquifer.
Services provided : The model developed included:
- Delineation of the aquifer boundaries, between the Devonian limestones and the Upper and Lower Devonian shale formations.
- Identification of production facilities and their production characteristics (physico-chemical data, production history, etc.
- Identification of monitoring stations, and the recording and interpretation of measured values: piezometers, rainfall stations, water-level gauging stations.
- Survey of springs and other aquifer discharge points.
- Mapping of the piezometric surface.
- Identification of known karst areas, based on available knowledge.
- Development of a conceptual model and a mathematical model based on the literature review and the hydrogeological map, highlighting groundwater recharge, the location of recharge zones and an estimate of variations over time as a function of rainfall, and aquifer outflows (drainage via springs and rivers, abstraction from boreholes and production wells, evapotranspiration)
- Model calibration and pumping simulations, including the impact of drawdown on Natura 2000 areas.
Reducing Vulnerability of Pacific ACP States – Final Evaluation
Environment (EV)
Project : The 8th and 9th EDF "Reducing Vulnerability of Pacific ACP States" projects focused on strengthening the integrated development of the Pacific ACP States, concentrating on three major areas characterising island systems, namely risk mitigation and assessment, construction aggregates, and drinking water supply and sanitation. The 8th EDF project, covering 8 states, began in March 2002 for a duration of 4 years with a budget of €7 million. The project was extended until 31 December 2007.
As an extension and complement to the 8th EDF activities, a 9th EDF financing agreement was signed in March 2004, covering 6 additional states, for a duration of 4 years with a budget of €2.5 million. The project's implementation phase was extended until 31 December 2008.
Services provided : The assignment consisted of the final evaluation of these projects.
The objectives of the final evaluation were to:
-determine the efficiency, effectiveness and impact of the projects and the sustainability of the main results (expected or otherwise);
-assess the extent to which the projects' results have been sustainably maintained by the countries involved and by SOPAC;
-assess the degree to which the projects' goals, objectives and targets, as defined in the logical frameworks, were achieved;
-examine the problems encountered, lessons learned and successes likely to strengthen institutional capacity and future planning, particularly the planning of future similar multi-country projects;
-Assess the question of sustainability after project closure.
Support for the Technical and Institutional Consolidation of the Office du Niger – Collector Drain Project in Kala Supérieur, Technical Studies and Tender Dossier
Water and Rural Development (WS/AG)
Project : The ACTION Programme (Support for the Technical and Institutional Consolidation of the Office du Niger) aimed, on the one hand, to increase the developed irrigated area within the Office du Niger zone, limit the adverse effects of poor drainage and safeguard water availability, and, on the other hand, to modernise the governance of the Office du Niger. One major-works component of the Programme was specifically aimed at constructing a collector drain within the Kala Supérieur system.
Services provided : The objective of the assignment entrusted to the experts was to prepare a feasibility study, a Detailed Design Report (APD) and a Tender Dossier (DAO) for the works, for the construction of a collector drain approximately 40 km long in Kala Supérieur.
In this context, the team carried out the following activities:
•Collecting baseline data for the study area;
•Conducting topographic surveys;
•Conducting a project feasibility study;
•Preparing a detailed design of the works to be carried out;
•Preparing a tender dossier for contractors for the execution of the works.
Study of the Legal and Regulatory Mechanisms Relating to the Reuse of Treated Wastewater (REUE) for Non-Agricultural Purposes
Water Supply and Sanitation (WS)
Project : The water issue in Morocco shares, in its fundamental characteristics, all aspects of the water question in the MENA region. On the one hand, demand is constantly increasing owing to demographic factors, rising household living standards and the needs of productive sectors including tourism, agriculture, livestock farming and industry; on the other hand, supply remains fixed, being tied to various physical or natural constraints. The seriousness of the issue also stems from the fact that water is bound up with long-standing behavioural traditions relating to its use, and from the need to translate today's requirements in this area into appropriate legislation.
Particular attention is therefore being paid to the reuse of treated wastewater (REUE) for non-agricultural purposes. Such an approach would indeed be capable of significantly supporting Morocco's strategic water policy, while also ensuring water availability in certain key areas. It is within this strategic perspective that the present study is set.
Services provided : The objective of the study is to compare the technical and legal requirements relating to the reuse of treated wastewater (REUE) with the provisions currently in force in Morocco and, where applicable, to highlight specific shortcomings in this area, before proposing additions to the existing legal corpus with a view to enabling reuse in three areas: (i) industrial recycling, (ii) aquifer recharge and (iii) irrigation of forestry plantations.
The study is structured in 4 phases with the following expected outputs:
•Phase 1: Morocco-specific characteristics - Sector analysis
•Phase 2: Status of treated wastewater reuse in three Mediterranean basin countries, covering industrial recycling, aquifer recharge with treated water and forestry.
•Phase 3: Proposals for the various REUE options for industry in the Sebou basin; proposals for aquifer recharge options using treated wastewater; proposals for forestry options;
•Phase 4: Debriefing.
Drinking Water Supply and Study of Sanitation and Solid Waste Treatment for the Municipality of São Domingos
Water Supply and Sanitation (WS)
Project : Objective of the assignment:
To identify a sufficient water resource for the Municipality of São Domingos over a horizon of more than 20 years. Carrying out a participatory sanitation study in the municipality of São Domingos, considering the various development scenarios for the water distribution system serving the population.
The sanitation study in the municipality of São Domingos had to take into account two scenarios:
the first assuming a network with household connections;
the second without household connections (standpipes).
The study had to consider the costs of the sanitation systems under both scenarios and take into account the socio-economic aspects of implementing these systems.
Services provided : Study of the potential of local aquifers. Long-duration pumping tests and interpretation of results. Drilling of new production boreholes and works supervision.
Preparation of technical files and tender documents.
Situation analysis (description of subsurface conditions, available land, socio-economic and socio-cultural aspects, description of traditional sanitation practices, identification of existing sanitation systems, analysis of problems and constraints – from the target group's perspective, resource protection, health, standard of living, economic viability, service security)
Study of possible strategies for liquid sanitation and solid waste: evacuation and treatment of stormwater, greywater and faecal matter. Study of solid waste collection and treatment. Preparation of technical files and tender documents.
Technical Assistance: Provision of an Agronomist Expert – Rural Infrastructure for Capacity Building of the National Authorising Officer (NAO) Services in the Management of the EC Cooperation Portfolio
Agriculture and Rural Development (AG)
Project : The agronomist expert supported the NAO in the following tasks:
•Coordination, programming and regular monitoring of aid in the agriculture/rural development/infrastructure sector;
•Preparation, presentation and appraisal of programmes and projects in the agriculture/rural development/infrastructure sector;
•Preparation of tender dossiers and, where applicable, call-for-proposals documents, as well as all related procedures;
•Follow-up on the signing of contracts and their amendments approved by the EC;
•Support for the disbursement and authorisation of expenditure in accordance with applicable procedures and within the limits of allocated resources;
•Ensuring, from an economic and technical standpoint, the monitoring of the proper execution of approved programme estimates and projects;
•Implementation of cooperation activities and strengthened coordination with other donors.
Services provided : 1) Management of the complete project and programme cycle for decentralised operations, from alignment with cooperation objectives through to final evaluation
• Contribute to the programming, definition and evaluation of project cycles; • Contribute to all stages of the procurement process (drafting of specifications, launching of tenders, etc.); • Monitor ongoing projects;
2) Management of project and programme implementation activities
• Ensure that all conditions necessary for the start-up of projects and programmes are met: institutional, budgetary, staffing and logistical; • Preparation of terms of reference and of documents required for tenders and calls for proposals; • Preparation, launch and evaluation of calls for proposals and tenders; • Decision-making and preparation of all documentation relating to contract award and execution, grant awards and contracts, including subsequent amendments; • Monitoring the progress of project and programme implementation and ensuring monitoring (jointly with the EC Delegation): approval or, where necessary, drafting of work plans, review of technical and financial progress reports, and verification of implementation and compliance with EDF rules and procedures.
3) Evaluation and audit: facilitating the monitoring of performance indicators used to measure the success of projects and programmes.
Project : The overall objective of the study was to identify and develop a medium-term programme for the rehabilitation of urban infrastructure in Bangui and Bimbo, aimed at poverty reduction and socio-economic development.
More specifically, to establish a diagnostic assessment of the organisation, functioning and resources available to the urban development stakeholders in Bangui and Bimbo, and in particular:
- To conduct technical studies in the following areas: rehabilitation of sewer/drainage collectors, opening/rehabilitation of roads, rehabilitation of priority bridges, upstream retention structures, and socio-environmental impact, in order to produce a preliminary design (APS) for the priority infrastructure to be rehabilitated.
- To propose the Terms of Reference (ToR) for the successive implementation phases of the Programme.
Services provided : The first step was therefore to produce a preliminary design (APS) for the urban infrastructure to be rehabilitated in Bangui and Bimbo.
The second step involved proposing Terms of Reference for the successive implementation phases of the Programme, namely the ToR for the preparation of the Detailed Design and Bidding Documents for the works, as well as for the supervision/monitoring of those works.
Urban development stakeholders in Bangui and Bimbo were informed of the strengths and weaknesses specific to their institutions.
Results:
- An interim report on activities already carried out, proposing lines of work and activity prioritisation, presented at a debriefing session with the stakeholders concerned.
- The preliminary designs (APS) for the priority infrastructure.
- The ToR for the preparation of the Detailed Design and Bidding Documents for the works, as well as for the supervision/monitoring of those works.
- A draft summary Action Sheet (FA), the Technical and Administrative Arrangements (DTA), including the (complete) Logical Framework Matrix and activity timeline, and a Feasibility Report. - A final report
Muang Long Drinking Water Supply Project (Laos)
Water Supply and Sanitation (WS)
Project : The project provides for a water supply system for the town of Long (2,300 inhabitants) at a rate of 125 m³/day.
The system comprises a dual network with river abstraction, filtration/flocculation, reservoir chlorination and individual household connections.
The project aims to contribute to improving the living conditions of semi-rural populations in northern Laos, with the specific objective of supplying the population of Long with drinking water.
Services provided : Services consisted of defining the institutional setup, reviewing and amending the detailed preliminary design, coordinating stakeholders and village participation, and providing technical supervision of works carried out by the contractor.
Project : The objective of the study was to define the scope, content and implementation arrangements of the rural development programme for the North-West, East and Far North Regions.
More specifically, the study aimed, on the one hand, to collect and analyse socio-economic data in the relevant Regions and Departments in order to supplement the information gathered during the identification phase, and on the other hand, to formulate the rural development programme for the North-West, East and Far North Regions.
Services provided : Result 1: A programme action sheet was drafted;
Result 2: Technical and Administrative Arrangements (DTA) were produced;
Result 3: Terms of reference for Technical Assistance to the programme management unit were prepared.
A) Diagnostic analysis and development of baseline indicators
- identification and analysis of stakeholders and key target groups;
- collection and analysis of socio-economic data for the selected departments in the three regions in order to determine the priority needs of target populations;
- diagnostic analysis of inventories of socio-economic infrastructure to determine unmet needs, as well as the institutional capacity of local administrations and community organisations to take ownership of and sustainably manage them;
B) Formulation of the rural development programme for the North-West, East and Far North Regions. The 3 main results are: i) The living environment of populations in the target regions is sustainably improved (infrastructure); ii) Population incomes are sustainably improved (crop and livestock production, income-generating activities); iii) The capacities and own revenues of the decentralised territorial authorities concerned are sustainably improved.
Design and Supervision Services for the Construction of Drinking Water Supply and Sanitation Systems in 14 Centres, Ségou and Sikasso Regions, Mali
Water Supply and Sanitation (WS)
Project : The specific objective of the Programme for Access to Drinking Water, Basic Sanitation and Urban Development in the southern focus area of PIC II (PEA) is the sustainable improvement of the population's sanitary conditions and public health in urban and rural areas. The added value of the PEA will stem from the strong emphasis placed on the operationalisation of new institutions, which will significantly contribute to strengthening the accountability of local authorities in the water and sanitation sector.
Sanitation will have a major impact on residents' living conditions by improving public health and limiting the effects of flooding.
At the end of the contract, the following infrastructure was expected to have been completed:
- 14 water supply systems (AEP), in rural (centres of 2,000 to 5,000 inhabitants) and semi-urban (5,000 to 10,000 inhabitants) areas, drawing on existing boreholes (minimum 5 m³/h). Solar and/or diesel pumping.
- 2,400 Sanplat latrines and 300 Ecosan latrines, in the same centres
- 2x20 latrine blocks in schools
- 20 latrine blocks in community health centres (CSCOM)
Hydraulic engineer: 45.6 person-months – Civil/hydraulic engineer: 5.5 person-months – Socio-economist: 3 person-months
Services provided : • Preparation of detailed design (APD) studies and tender documents (DAO) for the construction of boreholes and piezometers, civil works, and specifications and tender documents (DAO) for the procurement and installation of supplies and equipment for the 14 water supply systems in urban and rural centres;
• Technical studies (topographic surveys and hydrogeological studies) and socio-economic studies required for the final selection of PEA intervention sites; accompanying measures planned for beneficiaries and local authorities (CT);
• Monitoring/supervision of works and equipment installation; establishment of water user associations (AUEP) in the programme's beneficiary centres
• Monitoring of technical and financial management training for AUEPs and private operators by the STEFI units;
• Latrine construction campaign and hygiene and sanitation information and education activities (1,800 structures, latrines + showers + washing areas + reed-bed treatment), developing partnerships with the regional directorates of public health and of sanitation and pollution control;
• Support to municipal project ownership and to the organisation of municipalities.
Project : The purpose of the assignment was to develop a national sanitation strategy, taking into account technical sanitation solutions as well as cross-cutting issues such as HIV/AIDS, gender aspects, poverty, and the environmental impact of water provision.
Particular attention was given to the core building blocks for developing the strategy:
- analysis of the current situation,
- definition of goals and objectives,
- analysis of existing institutional capacity,
- implementation of an institutional gap analysis programme,
- formulation of a capacity-building plan,
Implementation timeline for the sanitation strategy and cost budgeting.
Services provided : The final report presents the framework of the National Sanitation Strategy.
The final report highlights the strategy's objectives, WSASP principles and other relevant government policies, and also proposes implementation strategies and approaches that the government can adopt to improve sanitation coverage across the different regions of Namibia.
• Rural sanitation management
• Environmental policy
The strategy is linked to NDP3 and Vision 2030; the Millennium Development Goals; the Poverty Reduction Strategy (PRS), National Poverty Reduction Action Programme (NPRAP) and WSASP 2008.
• Institutional structures
• Hygiene awareness and promotion
• Performance monitoring
• Cost and budget
• Cross-cutting aspects
Project : The Integrated Rural Development - Natural Resources Management (DRI-GRN) project was carried out in 6 provinces of northern Morocco between 1999 and the end of 2008. The objectives of the DRI-GRN Project were: i) to improve the living conditions and income of the population, ii) to increase and diversify primary-sector production, iii) to conserve and sustainably manage natural resources, and iv) to develop the population's participation in, and responsibility for, its own development.
Services provided : The objective of the Mission was to carry out the final evaluation of the MEDA DRI-GRN project. An analysis was carried out in terms of relevance, effectiveness, efficiency, sustainability and impact, both for the Programme as a whole and for its individual activities.
Lessons were drawn and recommendations formulated to improve future EU-Morocco cooperation programmes.
Technical Assistance to the Water & Sanitation Sector - Fiji
Water Supply and Sanitation (WS)
Project : The objectives of the assignment were to assist the Government of Fiji:
- By assessing water management policies and the water and sanitation sector in the country, helping prepare and/or process key strategic documents for the sector's future development, and supporting the coordination process among the various stakeholders
- By identifying potential interventions to improve water governance in Fiji and to increase access to quality drinking water and sanitation through projects to be financed under the 10th EDF.
The assignment was carried out in three phases:
1) Phase 1: Overview and analysis of the water and sanitation (W&S) sector;
2) Phase 2: Identification of priority interventions to be financed under the 10th EDF and support for strengthening W&S sector governance;
3) Phase 3: Drafting of the project and budget for the 10th EDF, together with implementation arrangements.
Services provided : The main activities carried out by the expert were:
- Assisting the Government of Fiji and its National Authorising Officer by assessing the political, social, economic and environmental situation of the water and wastewater sector, the strengths and weaknesses of government services and the Fiji water authority, available budgets, and sector policy documents;
- Analysing the recommendations of the water governance programme for Fiji and identifying an approach for adopting a Sector-Wide Approach (SWAp) for water and sanitation;
- Providing support to the National Water Committee to discuss and subsequently amend the draft national water policy and to assist the relevant departments in securing its adoption by Cabinet;
- Assisting the National Authorising Officer in identifying projects eligible for financing under the 10th EDF within the water, sanitation and wastewater components;
- Developing a project identification sheet for the potential intervention under the 10th EDF.
"Drinking Water Supply and Hygiene/Sanitation Promotion (PHA) in Selected Peripheral Neighbourhoods of Bamako - Mali" and "Integrated Water Resources Management in the Inner Niger Delta – Phase 3" - Final Evaluations
Water Supply and Sanitation (WS)
Project : "Drinking Water Supply and Hygiene and Sanitation Promotion in Selected Peripheral Neighbourhoods of Bamako - Mali (AEPHA-Bamako)" and "Integrated Water Resources Management in the Inner Niger Delta – Phase 3 (GIREDIN 3)".
The AEPHA-Bamako project, co-financed by the European Commission, ran from January 2008 to December 2010. Its specific objective was to achieve sustainable improvement in access to drinking water and sanitation for disadvantaged populations in 7 neighbourhoods of Communes I and IV of the Bamako district, through an integrated approach supporting municipal project ownership. Total amount: €834,531.13
The GIREDIN 3 project, co-financed by the European Commission, ran from November 2007 to October 2010. Its specific objective was to sustainably improve access to drinking water and sanitation for disadvantaged populations of the Inner Delta through participatory, innovative approaches tailored to support municipal project ownership. Its intervention area covered 14 communes of the Inner Niger Delta, in the Mopti region. Total amount: €2,250,866
Services provided : The final evaluation mission conducted by the team of experts produced the following results:
•An analysis of the results achieved by the Projects, set against what had been planned in the logical framework.
•An analysis of the activities against the evaluation criteria (relevance, effectiveness, efficiency, sustainability, impact), also taking into account cross-cutting themes (institutional capacity building and project ownership, gender, environment).
•A contribution to capturing the lessons learned by the partners and authorities that took part in the steering committee.
•Short- and medium-term recommendations to support PROTOS in its future activities in the areas concerned.
The mission was carried out in 4 phases: i/ consultation and review of information, ii/ field study, iii/ debriefing and iv/ report writing.
Technical Assistance to the “Rural Water” Sub-Component, Danish-Swedish Support Programme to the Water and Sanitation Sector Programme (PROSEA)
Water Supply and Sanitation (WS)
Project : The intermediate BPO (Budget by Objective) objectives to which the programme contributes are: improving equitable and sustainable access to drinking water; ensuring an effective and efficient institutional framework for the sector. The immediate objectives of the sub-component in the programme's intervention area are:
• To promote equitable investment development for access to drinking water in rural areas at the level of each “cercle” (district).
• To develop drinking water supply networks in rural centres with more than 2,000 inhabitants and municipal headquarters with fewer than 2,000 inhabitants.
• To develop the project-ownership capacities of local authorities, at both the inter-municipal level (investments) and the municipal level (investment planning, management of water supply systems).
• To develop the capacities of the Regional Water Directorates (DRH) in planning and support to municipal project ownership.
Hydraulic engineer: 64 person-months
Services provided : The programme contributes to strengthening the State's decentralised departments so that they can fully carry out their core public functions, through the provision of technical assistance in three areas:
- Advisory support and assistance to project owners (support in preparing and monitoring service and works contracts, monitoring of accompanying measures, management of infrastructure, etc.…).
- Activity programming (Budget Programme by Objectives) based on municipal programming, budgeting, budget monitoring, and preparation of periodic progress reports.
- Monitoring of activities against sector strategies and procurement rules (approval of tender documents, contracts, payment orders to service providers, and provisional acceptance of works), etc.…
The objective of the technical assistance is to facilitate the establishment of functional and effective relationships between the State's decentralised departments (DRH and the Sub-Regional Water Department, SSRH) and municipalities, so that the ongoing evolution of the institutional framework does not adversely affect the achievement of the national strategy's objectives.
Project : In recent years, substantial infrastructure and industrial investment has taken place in the Western Lowlands, where two-thirds of the population live. The rapid expansion of the textile industry has increased demand for water supply and treatment infrastructure. The programme comprises 4 sub-projects, based on studies carried out under the 8th EDF. The overall objective of the Programme is to provide reliable, affordable water and sanitation services for domestic and industrial needs in the Lowlands. Each sub-project has its own specific objective.
The purpose of the assignment was to analyse the efficiency and effectiveness of the Programme's components, in light of its objectives, results and impact.
It also involved verifying that the Programme's components would be able to achieve their objectives, and providing advice where necessary.
Services provided : The evaluation provided specific recommendations for the continuation of the projects, in order to achieve their objectives, as well as to improve monitoring and indicators.
The evaluation also provided perspective and recommendations for the design of future support in the areas of capacity building and technical assistance to the sector.
The evaluation provided:
- an analysis of the problems to be identified and the projects' objectives in relation to their physical and regulatory environment
- an analysis of project monitoring and evaluation and the indicators to be used
- an analysis of how cross-cutting aspects were taken into account
- an analysis of the sustainability of activities and results
- recommendations for resolving problems and issues that could jeopardise the success of the projects
- lessons learned for future interventions and support to the sector
Project : The overall objective of the study is to assist the Government of Lesotho (GoL) in determining the future management and development of the water sector in Lesotho.
The specific objective of the study is to assess the feasibility of implementing a sector-wide approach for the water sector in Lesotho. To this end, the study determined the extent to which the criteria set out in the “European Commission Guidelines for Sector Budget Support” could be met. These criteria are:
1. soundness of the macroeconomic framework
2. the sector policy framework and national strategy
3. the medium-term expenditure framework for the sector
4. public expenditure accounting and management
5. the state of donor coordination
6. performance monitoring and client tracking systems
7. institutions and their capacities
Services provided : • Analysis of the objectives of current water sector programmes and assessment of their capacity to absorb budget support.
• Identification of how the government's various water sector projects fit into donor programmes and strategies.
• Identification of priorities for budget support, through participatory workshops.
• Analysis of current programmes to identify links with other operations of the sector's various stakeholders.
• Analysis of areas of convergence with other departments, programmes and initiatives to achieve the objectives of budget support
• Identification of the critical assumptions on which the success of budget support depends, in terms of objective, activities and results.
• Consideration of existing sector strategies (for example, DRWS already benefits from budget support).
• Any other activity that will help determine the feasibility of budget support for the water sector in Lesotho.
Project : The Belgian Technical Cooperation (CTB) is the implementing agency for the Belgian federal government's direct bilateral cooperation. Under the terms of its management contract, the State evaluates the quality of CTB's services each year, based on a minimum of 10 projects. These are assessed according to the project cycle and against five evaluation criteria: relevance, effectiveness, efficiency, sustainability and impact. For 2008, a total of 12 projects were selected in Bolivia, Peru, Ecuador, Algeria and Morocco, with a specific cooperation sector also chosen for each country. The purpose of the evaluation is to report to the State on the quality of CTB's services and to improve them through collective learning based on the evaluation's findings, conclusions and recommendations.
Services provided : Delivery of the Morocco component, covering three selected projects in the water and sanitation (W&A) sector. Preparatory phase comprising document review and interviews in Belgium, site visits to the selected projects, interviews with partners (national institutions and organisations), beneficiary communities, CTB and the cooperation services of the Belgian embassy. Drafting of the report and presentation to the DGCD (Directorate-General for Development Cooperation).
Project : The DRI/GRN Programme, with an initial overall budget of €74.6 million, was structured around three operational components: (i) a local development sub-programme centred on soil and water conservation (CES) works (SP/CES); (ii) an integrated agricultural development sub-programme in south-western Kef (SP/SOK); (iii) a sub-programme for promoting farmers' organisations and financing, supporting the first two components (SP/OPF). By its completion, the Programme's achievements included: training of managers (particularly in participatory approaches) and beneficiaries;studies and site development plans;construction of hillside reservoirs and groundwater recharge and spreading structures; Irrigation works: irrigation equipment for hillside reservoirs and shallow wells, rehabilitation and creation of public irrigated perimeters;soil and water conservation (CES) works;socio-economic infrastructure: shallow wells and drinking water supply systems, access tracks, etc.; specific actions supporting women (income-generating activities, training); research and development activities.
Services provided : The final evaluation aimed to assess the status of the various objectives pursued by the programme, using a component-based approach, with a view to assessing performance against the standard criteria in this field: relevance, effectiveness, efficiency, impact and sustainability, as well as the criteria specific to the EC: coherence and EU value added.
The work followed a standardised process, in line with the EU approach, broken down into four main phases:
1. Start-up and documentary phase: briefing, document collection and initial review of key documents, drafting and analysis of evaluation questions, scheduling of evaluation activities.
2. Field phase: field investigations carried out according to the previously defined work plan and schedule, leading to a review of the reliability of the data collected and the formulation of preliminary conclusions.
3. Synthesis phase: drafting of the evaluation report.
4. Presentation of the report at a two-day seminar and finalisation.
Sustainable Development Programme in the Kidal Region (DDRK Phase 3)
Water and Rural Development (WS/AG)
Project : The third phase of the DDRK (2008-2011) supports the capacities of local authorities, access to vocational training, improvements in health and access to water, as well as improvement of the pastoral sector.
Services provided : Studies, tendering and works supervision for improving water supply in 5 towns in the Region.
Provision of a hydrogeologist
Improvement of pastoral water supply conditions
Project : Overall objective: pre-feasibility study for 2,000 ha to be irrigated.
Specific objectives:
1. Identify all existing physical constraints that could hinder the planned development. The assessment covered climate, water, soil and topography, vegetation and existing infrastructure.
2. Identify other possible constraints that may exist (land or water rights, etc.).
3. Define the studies required to assess the feasibility of the development and for detailed design, including contractual documents.
Services provided : Pre-feasibility study.
Field visit to assess the potential of the proposed areas.
The engineering services covered: the pre-feasibility study.
The study also determined the cost of the studies required for:
- development of irrigation, drainage and access road infrastructure for full water control farming of 2,000 ha (5,000-acre concession);
- definition of agricultural machinery requirements (tractors, harvesters, haulage equipment, etc.);
- construction and equipping of drying, processing and storage facilities for the production.
Project : PSANG II is an integrated rural development project whose objectives in the rural water sector were to install 180 modern wells and rehabilitate 50 boreholes. Constructing boreholes in this region would make it possible to cover a larger number of villages than modern wells, given the latter's excessive cost. Nevertheless, establishing a sustainable mechanism for the upkeep, maintenance and management of boreholes is a prerequisite before deciding whether or not to limit the water supply source to boreholes alone.
Services provided : Preparation of a water map for the PSANG II coverage area.
Development of a framework for establishing a sustainable upkeep and maintenance mechanism.
- Identification of a local private entity capable of ensuring pump upkeep and maintenance (consultation with the various stakeholders, identification and selection of the operator);
- Proposal of local management structures;
- Proposal of an upkeep and maintenance contract setting out the rules of engagement between the various stakeholders (village development committees, local operator, user association, Water Directorate, local administration), together with regulations (developed in consultation with beneficiaries) including a pricing system and management of funds generated from water sales;
- Training (pump installation and maintenance, local manufacture of spare parts, stock management, etc.) provided by the DUBA pump supplier, for three technicians from the operator identified to ensure the upkeep and maintenance of DUBA pumps;
- Establishing links between village committees and/or the water point user and upkeep association, the national spare parts operator, and the pump manufacturer.
Development plan and detailed study for the realignment of the La Quinte River - Gonaïves
Water and Rural Development (WS/AG)
Project : With a view to agricultural recapitalisation of the Gonaïves plain, it is essential to reduce the flood risks caused by the overflowing of the La Quinte River, while consolidating the potential use of base flows for irrigation purposes. In this context, the Gonaïves Rehabilitation Programme (PRG) decided to study a development plan for the realignment of the La Quinte River from the locality of Mapou-Chevalier to its mouth, a stretch of approximately 14 km.
The overall objectives are to help prevent flooding in the Gonaïves urban area and its surroundings, and to contribute to better water resource management for agricultural development in the Gonaïves plain. The specific objective is to establish a comprehensive development plan for the La Quinte River to prevent the overly frequent flooding of the Gonaïves urban area, residential clusters, and plantations on the plain.
Services provided : o Use of available data to simulate the flood characteristics of the La Quinte River for the following return periods: 1 year, 5 years, 10 years and 25 years.
Presentation of a proposed development plan that takes into account the urban planning, agricultural and economic constraints of the area.
o For priority or urgent works eligible for financing under the PRG, preparation of written documents (technical specifications, estimated cost framework and confidential cost estimate) and detailed drawings for the tender dossiers.
o Preparation of standard drawings and preliminary design studies for La Quinte River works not included among those to be financed by the PRG.
o Assessment of the social, economic and environmental impacts caused by the development works.
Technical Adviser: Water Expert to assist with the preparation, monitoring and harmonisation of projects and programmes funded by the European Union
Water Supply and Sanitation (WS)
Project : The overall objective of this assignment is to ensure the preparation, monitoring and harmonisation of projects and programmes funded by the European Union.
The specific objective is to coordinate work with the Delegation, the Ministry of Water Resources, and project implementing agencies (such as NGOs, UNICEF and the World Bank) and the NAO, so that contracts and project documents are submitted on time and in accordance with EU procedures.
Services provided : The expert works as Technical Adviser to the Delegation of the European Commission and the Ministry of Water Resources.
His/her main tasks are as follows:
1. Project cycle management
2. Preparation and monitoring of tenders
3. Sector analysis, formulation and programming
4. Sector monitoring
5. Representation, negotiation and coordination with other donors
6. External communication regarding programmes and projects
Identification study of mineral-quality water sources in the commune of Marmelade - GCP/HAI/O19/CAN
Water Supply and Sanitation (WS)
Project : The objective of the CIDA-FAO-MARNDR project is to contribute to poverty reduction and environmental rehabilitation through the following activities:
- agroforestry;
- agricultural marketing;
- watershed management and environmental protection;
- capacity building for local stakeholders to take charge of their personal and collective development.
Services provided : Assessment of the possibilities and feasibility of capturing one or more of the commune's numerous springs to market the water under the "Mineral Water" label:
- Hydrological, geological, lithological and hydrogeological aspects of the project area;
- Assessment (quantity and quality) of existing and potential water sources in the project area;
- Mapping of the sources, indicating the characteristics of each;
- Selection of sources with potential for industrial exploitation under the "mineral water" label
Water and Sanitation Master Plan and Water Management Plan for the town of Rundu
Water Supply and Sanitation (WS)
Project : Following developments in the water sector (investments from previous Lux-Development projects) and the sanitation sector (construction of a new wastewater treatment plant), it was deemed essential to update these master plans.
Rundu is a town of 70,000 inhabitants in northern Namibia.
Services provided : Inspection of existing facilities. Satisfaction surveys among users and staff of the Rundu Town Council.
Consideration of regulations and laws in force in Namibia.
Proposals for upcoming investments in Rundu.
Proposals for improving network management.
Feasibility Study for the Development of the Fourth Lake of the Lomé Lagoon System.
Water Supply and Sanitation (WS)
Project : Studies on sanitation in the city of Lomé, including the Sanitation Master Plan and its 2004 update, highlighted relevant recommendations concerning the development of the lagoon system as a whole, and in particular the marshy area that could accommodate a new lake. The updated Sanitation Master Plan, which had already been implemented for Lac Est and the balancing canal (dredging), and which was, at the time of the study, still being implemented for Lac de Bè and the Bè canal (dredging and desilting), recommended developing a 22 ha 4th lake in the marshy area, connected on the western side to Lac de Bè and, on the eastern side, to a main outfall discharging its waters
to the sea east of the Port of Lomé.
The purpose of this project was to conduct a feasibility study for
the development of the 4th lake of the Lomé lagoon system and the associated structures, including, among others, the outfall to the ocean and the interconnection with Lac de Bè.
The development of the lake is in line with the recommendations of the Lomé Sanitation Master Plan.
The works had yet to be defined. They were to be consistent with the logic of the city's urban stormwater drainage system, which had benefited from substantial investment over the previous five years, with the cleaning and restoration of the retention capacity of the three existing lakes and of the balancing canal between them. In addition, the rehabilitation and duplication works on the existing outfall of Lac Ouest were nearing completion.
Services provided : The study consisted of:
· Reviewing and adopting the hydrological assumptions for the catchments contributing to the lagoon system;
· Developing an initial simplified mathematical model of the lagoon system's operation, in order to test the retention and regulation capacity of the system in its current form;
· Defining various operating scenarios based on the increase in upstream inflows resulting from the urbanisation of the Tokoin plateau and the proposed developments;
· Identifying the various drainage solutions concerning: the extent of the 4th lake; the routing of the outfall; the interconnection with Lac de Bè and the lagoon system as a whole;
· Sizing and proposing preliminary concept drawings for these various structures;
· Costing the investments and, where appropriate, proposing a phasing of the works.
Evaluation of EC cooperation with Chad – Country-level evaluation
Water and Rural Development (WS/AG)
Project : Evaluation of the Commission's cooperation strategy and its implementation for the period 1996-2007. Relevance, coherence and complementarity of strategies, correspondence between programming and implementation, effectiveness, efficiency and impact of funded actions. Focal areas of cooperation: transport, water policy, macroeconomic support, health and rural development.
Services provided : Establishment of a reference group, preparation of the evaluation matrix, data collection and hypothesis verification, analysis and judgements.
Preparation of a quality assessment grid, summary for the Commissioners, response note (contradictory procedure)
Formulation of an emergency potable water supply programme in the provinces of Kirundo, Ruyigi and Rutana
Water Supply and Sanitation (WS)
Project : As part of its emergency programme in Burundi, the Belgian Technical Cooperation is funding several interventions, including one in the village water supply sector. It includes:
a. 75 boreholes drilled and fitted with handpumps in the provinces of Kirundo, Rutana and Ruyigi;
b. 125 springs to be developed or rehabilitated in Ruyigi province
The objective is that, at the end of the assignment, the programme has all the tools needed to properly launch activities, namely:
a. terms of reference for the various interventions;
b. clearly redefined and detailed intervention areas and programme;
c. recommendations for activity monitoring and supervision;
d. a revised cost estimate based on the new strategy.
Services provided : 1. Verification of the feasibility of replacing pump equipment to adapt it to borehole depths;
2. Definition of intervention areas based on the DTF (Technical and Financial Document), technical constraints and other stakeholders' programmes;
3. Definition of an intervention strategy and establishment of priorities for both boreholes and PSAs (developed springs);
4. Preparation of specifications for the construction of the 125 PSAs and the various training and awareness-raising activities;
5. Establishment of selection criteria for the agency responsible for implementing the PSAs and the training and awareness-raising activities;
6. Reassessment of the costs of the various activities and revision of the programme budgets;
7. Formulation, based on the defined programme, of recommendations regarding qualitative and quantitative monitoring and supervision of the various stakeholders;
8. Reformulation and detailing of the scope of all training activities, particularly for RCEs, in line with the actions of other stakeholders;
Support Programme for the Potable Water, Sanitation and Water Resources Sector (PASEPARE), Phase I, Mopti and Sikasso Regions
Water Supply and Sanitation (WS)
Project : The objective is to help reduce poverty in Mali by improving equitable access to potable water, sanitation and hygiene education, integrated water resource management, and more effective management of sector investments.
The programme has 2 components: 1. Support for the development and implementation of national water and sanitation policies and strategies. This component is based on decentralised project ownership. 2. Support for improving potable water and sanitation coverage. This component systematically includes the promotion of hygiene and individual sanitation in line with the National Strategy for the Development of Potable Water Supply and Sanitation in rural and semi-urban areas. Support is provided to municipalities and the DRACPN for the development and implementation of strategic hygiene and sanitation plans.
Plans included rehabilitating 19 boreholes, constructing 189 new boreholes, 4 new solar-powered water supply systems, 3,500 linear metres of collectors and gutters, and 59 school and public latrines.
O&M professionalisation expert: 1.2 person-months – Decentralised planning expert: 7.5 person-months – Sanitation expert: 9.3 person-months – Water resources and database expert: 11.1 person-months – Municipal capacity-building expert: 6 person-months - Hydrogeologist: 4.1 person-months
Services provided : Technical support to the DRHE (planning and programming, budgeting, coordination, monitoring and supervision, information systems and training).
Capacity building (DRHE, DRACPN, municipalities as project owners, user associations, private sector). Water resource monitoring.
Access to potable water for 194,000 people
- Capacity building of Regional Directorates within a decentralised and deconcentrated environment;
- Strengthening of municipal capacities in planning and project ownership for water and sanitation, within a process promoting inter-municipal cooperation;
Capacity building of community structures responsible for managing water infrastructure,
- Strengthening the skills and capacities of NGOs and the private sector in planning, implementing and monitoring water and sanitation sector interventions in the two regions
Evaluation of Regulation 2698/2000 (MEDA II) and its implementation
Environment (EV)
Project : The objective of the evaluation of Regulation 2698/2000 (MEDA II) and its implementation is to:
- analyse the performance of Commission aid to the Mediterranean Partner Countries (MPCs) under the MEDA II Regulation;
- draw lessons from previous cooperation in order to improve the implementation of the current strategy and indicative programmes and to prepare future ones, within the framework of the European Neighbourhood and Partnership Instrument, which succeeds and replaces MEDA II.
The evaluation covers cooperation with the MPCs under MEDA II (2000-2006). It includes Commission funds managed by the EIB.
Services provided : The main objectives of the evaluation are to:
- analyse the performance of aid to Mediterranean partners under MEDA II
- identify the main lessons from the Commission's past cooperation, with a view to improving future strategies and programmes in the region
- assess the relevance, coherence and complementarity of the Commission's strategic support with the Mediterranean Partner Countries
- assess the coherence and complementarity between the Commission's strategies at regional and country level
- assess the alignment between programming and implementation over the same period
Village and Pastoral Water Supply Programme in the Dosso Region (PHVP) – Assistance with monitoring and supervision of detailed hydraulic studies
Water Supply and Sanitation (WS)
Project : The PHVP, running for 5 years, operates throughout the Dosso region in support of water supply and basic sanitation within the context of decentralisation. Its Result 1 is: "Access to potable water in the villages and pastoral areas of the Dosso region is improved." It provides for: (i) construction of 30 new cemented wells and rehabilitation of 20 existing ones, (ii) 60 new boreholes and rehabilitation of 45, fitted with handpumps, (iii) 30 new small-scale potable water supply systems and rehabilitation of 11 existing ones.
Services provided : Assistance, monitoring and supervision of the work of the two local consulting firms engaged to carry out the detailed technical studies for the hydraulic component of the project (cemented wells, boreholes with handpumps, small-scale potable water supply systems). The two consulting firms' mission consisted of conducting outreach and awareness-raising activities, technical feasibility studies, detailed and environmental impact studies, and preparation of tender documents. The expert carried out 3 missions at 3 key stages: launch of the studies and implementation of the socio-economic and technical feasibility studies - validation of the socio-economic and technical feasibility and definition of the outline for the detailed technical and environmental impact study - validation of the detailed studies and preparation of tender document drafts.
Options for EU support to ACP countries for the development of biofuels and their feedstocks
Agriculture and Rural Development (AG)
Project : The overall objective of the study is to assist in formulating an EU response strategy aimed at effectively and efficiently helping ACP countries derive sustainable benefit from their biofuels and feedstocks.
The work on the response strategy includes the formulation of alternatives for specific regions.
Future EU support to the biofuels sector in ACP countries is expected to primarily use EU financial instruments.
Nevertheless, the assignment made recommendations for the development of alternative financial instruments.
Services provided : The study is based on the observation and analysis of 6 countries selected for field visits.
The consultant worked in close collaboration with the European Commission and in liaison with the ACP Secretariat and other relevant partners.
The assessment covers 4 different but interconnected areas:
- Inventory: preparation of an updated compilation of biofuel production and use in developed countries.
- Prospects for developing countries: drawing conclusions on these prospects for developing countries (in general, but more specifically ACP countries), regarding biofuels and their feedstock production, and biofuel market development, based on external markets, national production characteristics and other relevant criteria.
- Assistance needs: identification of external assistance needs in developing countries, including ACP countries, in technical and financial terms.
- EU support: formulation of the most appropriate strategic support and identification of support options for the Commission, based on its comparative position vis-à-vis other donors and taking into account existing aid instruments.
Project : The overall objective is to diversify Fijian agriculture beyond sugar.
The feasibility study aims to identify potential food and export crops to be developed in the sugar belt region, as an alternative or complement to sugarcane.
Services provided : The study assesses alternative crops based on existing and future markets, as well as distribution channels.
After identifying the alternative crops, the feasibility study identified ways and means of overcoming constraints and weaknesses, and assessed the conditions necessary for their development.
The study defined a programme for financing the development of the most promising crops in the region and made technical, financial, economic, social, institutional and environmental recommendations.
Cross-cutting evaluation of hygiene and sanitation aspects
Water Supply and Sanitation (WS)
Project : The purpose of the cross-cutting evaluation was to analyse the relevance, efficiency, effectiveness, impact and sustainability of PROTOS's initial interventions and pilot experiences in hygiene and sanitation, in relation to its objective of sustainable, participatory and equitable water and sanitation management.
Services provided : • analyse the cost and technology of interventions (including analysis of the possibilities/limitations of ecological sanitation);
• analyse and propose financing methods (external and internal) and pricing structures, and assess willingness to pay for sanitation investments and for the upkeep of sanitary infrastructure (often linked to the household);
• analyse the potential and limitations of applying the various hygiene/sanitation aspects/components, differentiating between urban, rural and semi-urban settings;
• analyse the potential of H/S interventions in terms of strengthening management capacities and the "claiming capacity" of civil society;
• analyse the needs for organisational capacity building in H/S among PROTOS's partners/allies and PROTOS itself;
Formulation mission for Phase 3 activities of the Sustainable Development Project in the Kidal Region (DDRK)
Water and Rural Development (WS/AG)
Project : Following the first two phases of the Sustainable Development Project in the Kidal Region (since 1998), new activities needed to be formulated in the potable water supply and pastoral development sector.
Phase III runs from 2008 to 2011.
Services provided : Needs identification mission, taking into account previous phases and the updated needs of beneficiary populations
Mid-term evaluation and analysis of the Water Facility (EUR 500 M) and Energy Facility (EUR 220 M)
Water Supply and Sanitation (WS)
Project : Analysis of the funding allocation processes under the Water and Energy Facilities (relevance, effectiveness, efficiency, and alignment with goals and objectives).
Analysis of the contribution to EU policies and alignment with the needs and priorities of beneficiary countries.
Assessment of the added value of the Facilities compared with other financing mechanisms.
Services provided : Analysis and evaluation of funded projects, design and encoding of a database covering all applications received.
Site visits to projects in selected beneficiary countries. Missions to Uganda and Mozambique.
Project : The objective of the proposed programme is to increase the developed surface area in the Office du Niger zone, limit the adverse effects of poor drainage and ensure water availability, and, in addition, to modernise the governance of the Office du Niger.
The expected results are: development of 2,500 ha of new land, construction of 38 km of collector drains, improved water management, improved maintenance of the primary network, modernisation of the management of the Office du Niger, and implementation of a strategic decision-support tool (GIS).
The overall budget of the programme is 36 million euros, of which 30 million comes from 10th EDF resources and 6 million from Dutch Cooperation. 23 million euros is allocated to works. 8.4 million euros is implemented via sector budget support and 850,000 euros via a delegation agreement with AFD.
Services provided : Stage 1 - Analysis and proposals: analysis of the situation and performance of irrigation and rice cultivation at the Office du Niger, proposals for intervention
Stage 2 - Feasibility report and associated documents (Project Identification Sheet (FIP), Technical Administrative Sheet (DTA), Terms of Reference for studies and technical assistance)
Project : The programme developed aims to improve and intensify agricultural production in lowland areas by increasing the developed surface area (50,000 ha of new developments), facilitating off-season cultivation (10,000 wells constructed), and ensuring the long-term sustainability of lowland farming through hillside protection (protection of 167,000 ha of hillsides). The programme also establishes an operational system for dynamic monitoring of rice cultivation, both spatially and temporally. Finally, it aims to improve the competitiveness of the rice sector in order to ensure better market supply.
• Development of the logical framework;
• Definition of the project's institutional anchoring;
• Proposal of accompanying measures required for the project;
• Definition of capacity-building needs for the various stakeholders;
• Proposal of measures to intensify rice production;
• Analysis of proposals made by the management unit regarding the establishment of contractors, and proposals for system improvement;
• Assessment of the techniques used by local populations for developing small lowland areas, with proposals for improvement;
• Assessment of proposed training programmes and proposals for improvement;
• Financial assessment of the works and training components.
Services provided : Baseline assessment of rice cultivation in Burkina Faso – ex-ante technical and financial evaluation and formulation of the programme's three components: "lowland development", "rice cultivation monitoring", "stakeholder capacity building and institutional support" - Feasibility study for a rice-growing lowland development programme (50,000 ha) and rice sector monitoring.
GIS and aerial photography study:
• Evaluation, based on the test carried out in 2006, of a rice cultivation monitoring system using reference lowland plots;
• Determination of monitoring frequency, the methodology for conducting field surveys, photograph interpretation and results reporting;
• Assessment of the rice cultivation monitoring component and the relevance of its integration into the lowland development project.
• Analysis of the techniques used in 2006 and proposals for improvement;
• Assessment of costs for monitoring rice production using aerial photography and the timing of photographic surveys.
Final evaluation of project NAM/338, water supply in Omaheke and Otjozondjupa
Water Supply and Sanitation (WS)
Project : Following discussions with the National Planning Commission and a preliminary assessment of priority intervention sectors, the Ministry of Foreign Affairs of the Grand Duchy of Luxembourg decided to fund a water supply project in the Otjozondjupa and Omaheke regions (NAM/338).
The project was formulated with the following overall objective: to contribute to long-term socio-economic development by assisting the MAWF (Ministry of Agriculture, Water and Forestry) in its efforts to manage resources according to equitable and sustainable principles, and to ensure a permanent potable water supply service for rural communities in central Namibia.
Services provided : The objective of the assignment was to carry out the final evaluation of project NAM/338 on behalf of Lux-Development Agency, drawing lessons learned during project implementation and making recommendations to guide Lux-Dev, the MAWF and the project team in the formulation of similar projects.
- Analysis of results and the specific objective, review of project progress at the time of evaluation compared with the objectives set out in the project document
- Description of the project's area of influence and potential beneficiaries
- Analysis of project management and monitoring
- Analysis of the project using objective evaluation criteria, taking cross-cutting aspects into account
- Drawing lessons learned and providing recommendations for financing future projects of the same type in the same sector
Sustainable Oasis Development - PDDO - Design of a construction technique for water-retarding sills in oasis areas
Agriculture and Rural Development (AG)
Project : The PDDO comprises five components:
1 – Structuring of oasis communities
2 – Sustainable development of oasis productive capacities
3 – Development of local financial services
4 – Development of basic infrastructure
5 – Coordination, monitoring and evaluation
The objective of the programme is to establish a solid development base and the conditions enabling oasis communities to take charge of their own development and participate effectively in achieving national objectives for poverty reduction and combating environmental degradation.
Services provided : Design of a construction technique for water-retarding sills in oasis areas (sandy soils).
The objective of the assignment is to propose appropriate technical solutions to address the technical shortcomings identified in the water-retarding sills built under Phase II of the Oasis Development Project.
Mid-term Evaluation of the Western Water Resources Development Programme (VREO) - IWRM
Agriculture and Rural Development (AG)
Project : Mid-term evaluation of the programme.
Services provided : Relevance of the programme design, effectiveness, progress of operations and intermediate results.
Organisation, budget analysis and analysis of the impact of the IWRM approach.
Mid-term Evaluation of the "PACSU" Project, Assistance, Training Support and Supervision Unit
Agriculture and Rural Development (AG)
Project : The "PACSU" project, an assistance, training support and supervision unit, aims to provide the training and support needed for the irrigation rehabilitation and agricultural diversification programme in former banana-growing areas of Lower Shebelle and Lower Juba in Somalia. PACSU began in January 2006 and was due to end in January 2008.
Transitional Post-Conflict Reconstruction Project (PTRPC)
Water Supply and Sanitation (WS)
Project : Formulation of the socio-health component of the PTRPC. Drinking Water and Sanitation components.
Overall objective: to contribute to poverty reduction and improved health of rural populations through a sustainable public water and sanitation service.
Specific objective: sustainable improvement of drinking water supply for the population of rural Bujumbura through the construction/rehabilitation of water supply systems and the development of springs.
Services provided : Formulation of the component, participatory workshop, definition of resources to be implemented, cost estimates.
Expected results:
1. Improved drinking water supply coverage
2. Improved water service management framework
3. Improved hygiene and sanitation conditions
4. Improved resource protection
Social Investments in Novi Pazar YUG006
Agriculture and Rural Development (AG)
Project : The objective of the project is to contribute to policy reforms and the reconstruction programme in Serbia, and more specifically to improve service delivery to the population of Novi Pazar - Sandzak Region. The project has 4 components: 1/ Strengthening municipal management capacity for service delivery; 2/ Rehabilitation and reinforcement of the main water supply system; 3/ Extension and rehabilitation of basic educational institutions; 4/ renovation and equipping of the Novi Pazar medical centre and paediatric service.
Services provided : Interim evaluation of the YUG006 project: analysis of results and specific objectives achieved in the 4 components, analysis of project management and monitoring.
Project : Support to the national sanitation programme, construction of wastewater treatment plants in urban centres of the Sebou basin (Fez). Strengthening the role of basin agencies in the management of the basin's water resources.
Services provided : Project design, scope, sector coherence, and siting. Definition of the technical and financial arrangement proposed by the Moroccan Authorities to ensure the coherence and complementarity of the EU grant (10th EDF) with EIB and AFD support. Analysis of the quality of technical studies for the preparation of infrastructure projects, constraints and procedures. Definition of technical assistance needs for MATEE and the hydraulic basin agencies.
Evaluation of the West Africa Agricultural Research Support Programme (PARAO)
Agriculture and Rural Development (AG)
Project : The overall objectives of PARAO are:
1° to contribute to the improvement and adaptation of agricultural practices and policies implemented in West Africa in response to changes in the economic context and demographic and environmental changes
2° to help meet the challenge of socially and environmentally sustainable agricultural growth and development
Services provided : Final evaluation.
Assessment of the progress of results from research and development activities, estimation of the components' capacity to address medium- and long-term rural development challenges, analysis of the adequacy of the support provided by PARAO in relation to the components' strategic orientations and the use made of funding, and analysis of the adequacy of the planned institutional set-up and practical funding arrangements with the beneficiaries' management capacities.
Project : The overall objective of the Water Facility is to contribute to poverty reduction and sustainable development by achieving specific Millennium Development Goals and the objectives of the World Summit on Sustainable Development relating to water and sanitation.
The call for proposals is the core mechanism of the Water Facility and covers the following 3 components: improved water management and governance (A); water and sanitation infrastructure (B); civil society and decentralised cooperation initiatives (C).
Services provided : Evaluation of concept notes submitted to the Water Facility unit, full evaluation of proposals, support to Delegations, evaluation of shortlisted proposals, quality control, and assistance to the Water Facility unit and Delegations on matters of relevance, sustainability, and economic and financial feasibility.
Mid-term Evaluation of the "Regional Food Security Information System" (SIRSA) Project
Agriculture and Rural Development (AG)
Project : SIRSA covers 9 regions in 2 southern provinces, and its main objective is to collect, expand and integrate the various sources of socio-economic data provided to government decision-making levels.
The project aims to strengthen analysis, information quality, local authorities in food security, and rural development initiatives.
Services provided : Mid-term evaluation of project implementation (EUR 1.6 million). Site visits, review of methodology, effectiveness and efficiency, achievements and recommendations.
Technical Assessment of the Brava Wind Turbine
Energy (EG)
Project : The objective of the project was to contribute to the sustainable improvement of the quality of life of the 4 municipalities on the islands of Fogo and Brava by facilitating their access to quality drinking water and adequate sanitation services. The rehabilitation of the wind power generation system on Brava Island is one of the programme's specific objectives.
Services provided : Technical and financial assessment of the operation of the wind generator (Nordtank NTK150 wind turbine) installed at Bara. Definition of intervention modalities (equipment, technical assistance) for restoring the wind power plant to operation, report and conclusions.
Project : 1) The mid-term evaluation of the rice sector support programme – 8 ACP MLI 019 – takes place after 4 years of implementation. The evaluation consists of assessing the activities of each component and strand of the rice sector support programme currently under implementation.
2) An ex-post evaluation of the rehabilitation of the Boky Wéré 1 irrigation scheme - 6 ACP MLI 027, carried out in the early 1990s. Available information shows that this rehabilitation genuinely and durably changed the Particular attention was paid to how gender and environmental aspects were addressed.
3) Develop proposals to guide a future EC intervention under the 10th EDF, based on lessons learned from the evaluations and an analysis of the rice sector covering prospects, stakeholders, financing and current policies.
Services provided : The mission covered 3 tasks:
- Mid-term evaluation of the rice sector support programme - 8 ACP MLI 019 (EUR 16 million);
- Ex-post evaluation of the rehabilitation of the Boky Wéré 1 irrigation scheme - 6 ACP MLI 027;
- Development of proposals for a future EC intervention under the 10th EDF.
In addition, the team evaluated the extent to which gender and environmental aspects were taken into account in the execution of ongoing projects.
The mission proposed possible corrections/reorientations of the 8th EDF rice sector activities.
Technical Assistance for the Implementation of the Food Security Programme - Amhara Region
Agriculture and Rural Development (AG)
Project : The objective of the project is to assist the government, and more specifically the Food Security and Disaster Prevention Coordination Office, in defining and implementing food security programmes.
Services provided : Technical assistance to the Amhara Regional Government for the definition, development and implementation of food security programmes. Strengthening of institutional capacity and support for sector policy reforms, and support for private sector development.
Mid-term Evaluation of the World Vision West Africa Water Initiative (WAVI)
Water and Rural Development (WS/AG)
Project : Provides the background and framework for the tasks required to carry out a mid-term evaluation of World Vision's activities under the West Africa Water Initiative in Ghana, Niger and Mali.
Services provided : Mid-term evaluation of the WAVI programme in Ghana, Niger and Mali. WAVI is an initiative funded by the Conrad Hilton Foundation for the provision of drinking water and sanitation to rural populations. WAVI stems from a public-private partnership with a budget of USD 42 million over a 5-year period. Evaluation of programme results, review of documents and reports, technical and financial analysis of the programmes, implementation, and management of infrastructure and services.
Formulation of the Drinking Water Supply Programme in Southern Province - Nyaruguru, Huye and Gisagara Districts
Water and Rural Development (WS/AG)
Project : The action involves formulating a project for technical studies and works to rehabilitate 450 km of water supply networks, construct 160 km of new networks, and build 190 communal latrines within socio-economic infrastructure (markets, schools and health centres).
These water supply and sanitation (WSS) infrastructures are intended for the rural populations of the Nyaruguru, Huye and Gisagara Districts in Rwanda's Southern Province. Innovative accompanying measures are planned to study and establish private or community-based management structures, adapted to local circumstances, capable of ensuring the sustainable maintenance and management of the infrastructure. The action also includes information-education-communication campaigns aimed at improving the action's impact on public health, through the promotion of safe drinking water consumption and improved hygiene and sanitation practices.
Services provided : Programme formulation (EUR 5.7 million). Validation of programme feasibility, network design studies and works supervision, water supply system management models, detailed description of interventions and study methodologies, timeline and financial plans.
Sustainable Development in the Kidal Region (DDRK 2)
Water and Rural Development (WS/AG)
Project : The programme contributes to the development of the Kidal region (central and western parts), which presents a particularly difficult socio-economic and security context due to the extreme scarcity of its natural resources. Its overall objective is to help strengthen the peace process and achieve a sustainable improvement in the living conditions of the population of the Kidal region.
Services provided : The programme, planned over 3 years, had 5 specific objectives, implemented in successive, mutually reinforcing stages:
1. Consolidation of achievements from the first phase.
2. Development of new permanent, secure water points adapted to local conditions (wells, dams, underground dams).
3. GIS for the environmental management of water, livestock and pastures.
4. Training of local partners in hydrogeology, geophysics, and operational and maintenance procedures.
5. Construction of social infrastructure, and support in the education and health sectors.
HRDI, together with Proman s.a., was responsible for the overall implementation monitoring, supervision and control of the works.
A third phase was approved and is being carried out by the same consortium.
Support for Meeting the Conditions for the Implementation of the 9th EDF "Access to Drinking Water and Support for Sector Policy"
Water Supply and Sanitation (WS)
Project : The 9th EDF in Chad, in the field of drinking water, covers: 1) improving knowledge of water resources and water quality,
2) strengthening and structuring sustainable operating arrangements for water points built under previous EDFs,
3) construction and consolidation of new water points in priority areas,
4) strengthening of national capacities and institutional support.
Services provided : As a subcontractor, technical assistance to the Ministry of Environment and Water and its Directorate of Hydraulics for the fulfilment of its sector policy commitments.
Support for institutional capacity building and coordination of the 4 components of the 9th EDF programme.
Sector Evaluation of EU-Morocco Cooperation Actions in the Water and Sanitation Fields
Water Supply and Sanitation (WS)
Services provided : Sector evaluation mission of the EU-Morocco cooperation framework in water and sanitation: impact, efficiency, and coherence with EU policies in the sector.
Sector Evaluation of EU-Russia Cooperation Actions in the Water and Sanitation Fields
Water Supply and Sanitation (WS)
Services provided : Sector evaluation mission of the EU-Russia cooperation framework in water and sanitation: impact, efficiency, and coherence with EU policies in the sector.
Evaluation of Drinking Water and Sanitation Sector Activities under the Development Cooperation between Senegal and the Grand Duchy of Luxembourg
Water Supply and Sanitation (WS)
Project : The mission's objectives were to:
• Carry out, within the framework of the Indicative Cooperation Programme (PIC), an evaluation of Luxembourg Cooperation projects in Senegal in the water and sanitation sector;
• Provide guidance on possibilities for future interventions by Luxembourg Cooperation in the field of access to drinking water and sanitation.
Evaluation of 4 projects:
1. SEN/010 (EUR 2.2 million) "Health in the Saint Louis region"; 2. SEN/011 (EUR 3.3 million) "Village water supply and sanitation in the Tivaouane department";
3. SEN/012 (EUR 3.5 million) "Village water supply and sanitation in the Louga and Thiès region"; 4. SEN/017 (EUR 0.5 million) "Electrification and water supply for the CIFOP international practical training centre"
Services provided : • Concise sector analysis of existing information, presentation of the Senegalese Government's Water & Sanitation sector policy;
• Analysis of 4 projects;
• Institutional analysis presenting the strengths and weaknesses of the stakeholders of the evaluated W&S projects;
• Assessment of beneficiary participation and their views on the projects;
• Evaluation of the Grand Duchy of Luxembourg's contribution to achieving the Millennium Development Goals;
• Identification of investments planned by the Senegalese government in the W&S sector;
• Comments and recommendations on the direction to be given to Development Cooperation in Senegal in the sector;
• Analysis of a possible shift of cooperation towards "Budget Support"-type assistance.
Project : Independent thematic evaluation of EC activities and interventions in the water and sanitation sector (full hydrological cycle plus Integrated Water Resources Management) in developing countries between 1995 and 2004.
Services provided : Evaluation of EC cooperation services in the field of water and sanitation:
* relevance, impact, effectiveness, efficiency and sustainability of EC-funded activities in the water and sanitation sector within the framework of its overall cooperation
* complementarity and internal coherence between EC interventions in the sector and other EC policies, such as environment, agriculture, etc.
* coordination of EC actions and assistance strategy in the water and sanitation (W&A) sector with the policies and actions of Member States and other donors
Field missions in Russia, Bolivia, Cape Verde, Morocco, India, Samoa, South Africa.
Assistance to the Samoa Water Authority (SWA) for the Design and Construction of Drinking Water Supply Works on the Islands of Upolu and Savaii
Water Supply and Sanitation (WS)
Project : Total budget (services and works) of over EUR 11 million. The overall objective of the water sector assistance programme is to improve public health through the development, management, and conservation of water resources and wastewater disposal, within the framework of the sustainable economic and social development of Samoa.
The assistance services contract covered preliminary and detailed studies for the approval of water supply improvement projects across 7 zones on the islands of Upolu and Savaii. The works ultimately carried out will benefit a population of approximately 33,000 inhabitants.
Following the studies contract (budget of EUR 400,000), HRD was awarded the works supervision contract, with a budget of EUR 1,050,000 (2008-2010).
Senior expatriate water engineer: 550 person-days – Junior expatriate water engineer: 418 person-days – Senior local civil engineer: 198 person-days – Junior local civil engineer: 924 person-days – Expatriate hydrogeologist: 139 person-days – Local hydrogeologist: 44 person-days
Services provided : Under the studies contract, the consultant carried out the following services:
- hydrogeological investigations; Environmental Impact Assessment
- project planning and support to the water utility
- topographic surveys; - consultation with local communities
- detailed design and tender documents (production systems - intake, pumping and treatment, transmission, distribution); bid evaluation reports.
The following works were supervised:
(1) rehabilitation and construction of 6 water intakes; (2) rehabilitation and construction of 13 boreholes and associated facilities, including photovoltaic pumping and the replacement of 3 submersible pumps; (3) construction of 7 reservoirs; (4) installation of 13 new prefabricated storage units of 250 m³ and 100 m³; (5) refurbishment of 1 relay station and its associated facilities; (6) installation of 6 water treatment units with capacities of 20 and 60 m³/h; (7) installation of 7 chlorination units; (8) construction of approximately 90 km of networks.
Formulation of the Support Programme for Local Authorities on Drinking Water and Sanitation (PACTEA) - 9th EDF
Water Supply and Sanitation (WS)
Project : The mid-term review of the 9th EDF in Mali envisaged support of EUR 20 million to improve access to drinking water at the local authority level. Five options had been proposed for the rapid disbursement of these funds. The overall objective of the mission was to verify the feasibility of these five different proposals with a view to rapid implementation of the funds.
Services provided : The specific objective of the consultant's mission was to prepare and draft the financing proposals and all annexes and explanatory notes required for their submission to the EDF committee.
The consultant carried out the following services:
- assessment of the options (phase I)
- presentation of findings for validation of phase I results
- preparation of financing proposals (phase II) - presentation of findings for validation of phase II
- drafting of financing proposals for approval by the EDF committee
Project : Our mission was to assist the Client and Lux-Development (the project implementing agency representing the funding body) in supervising the 2006 tranche of rehabilitation works on the water infrastructure of the West San Plain.
Support to the Client and the project supervisor for the technical and financial supervision of the works to develop fully water-controlled plots (400 ha), an irrigation network, a drainage network, construction of a protective dike, partial development of the dead-end canal and the main canal, and supply and installation of cofferdams.
Services provided : Continuous technical, administrative, and financial monitoring of the site.
We supported the Client and Lux-Development by taking charge of the administrative and technical supervision of the site, and in particular:
- obtaining and monitoring the required bank guarantees;
- issuing directives and instructions to the contractor;
- notifying technical errors or omissions and overseeing their correction.
We carried out the following:
- supervision of site layout and setting-out;
- requesting and verifying all necessary soil and material tests;
- checking compliance with standard practice and specific technical requirements;
- ensuring that components and materials were delivered to the site in a timely manner so that the project supervisor could proceed with their acceptance;
- approving materials and supplies proposed by the contractor prior to procurement and installation;
- issuing any service orders required during execution.
Sustainable Development in the Kidal Region (DDRK Phases 1 to 2) – Water Component
Water and Rural Development (WS/AG)
Project : The programme's overall budget was €7.8 million, of which €3.26 million (works and services) was allocated to the water component. The programme contributes to the development of the Kidal region and town, an area facing a particularly difficult socio-economic context due to the extreme scarcity of its natural resources.
Its overall objective is to contribute to the sustainable improvement of living conditions for the population of the Kidal region and their livestock. A first phase took place from 2000 to 2005. A second phase was carried out from 2006 to 2008, and a third phase has since been approved and is currently being implemented, again by the same consortium.
The third phase of DDRK (2008-2011) supports the capacities of local authorities, access to vocational training, improved health, access to water, and improvement of the pastoral sector.
- Studies, tendering and works supervision for improving water supply in 5 towns in the Region.
- Provision of an international hydrogeologist plus various short-term experts (hydraulics expert, sanitation, GIS, water supply, etc...)
- Improvement of pastoral water conditions
Services provided : HRDI is specifically responsible for all studies, implementation monitoring, and supervision and monitoring of works related to water resource management.
HRDI pursued 4 specific objectives, implemented in successive, mutually reinforcing stages:
1. Data collection on water, livestock and fodder resources. Analysis of data and conditions relating to water resources and hydrogeological constraints.
2. Development of new, reliable and secure year-round water points adapted to local conditions (wells, dams, subsurface dams, Kidal water supply study).
3. GIS for the environmental management of water, livestock and pasture resources, resource mapping.
4. Training of local partners in hydrogeology, geophysics, operational and maintenance procedures, and GIS.
Mid-term and Final Evaluation of the Water Users Association Support Programme (WUASP)
Water and Rural Development (WS/AG)
Project : The main objective of the Programme was to establish various management systems for water supply schemes and to test their application in different contexts (technical and social).
Services provided : Mid-term and final evaluation of programme implementation, progress of rehabilitation works, training of users and operators, and replicability of the project.
Watershed Management Programme - Liaoning Integrated Environment Project (LIEP) - Water Quality, Integrated Groundwater and Surface Water Modelling
Environment (EV)
Project : The main objective of the Water Resources Management (WRM) component of the EU-China Liaoning Integrated Environmental Programme (LIEP) is to contribute to improved water resources management, pollution prevention and activity control in the Liaoning region, located within the Liao River watershed.
Services provided : 1. Water quality modelling: updating existing models of the Hun River in collaboration with the Chinese counterpart to link the model with the GIS, preparation of a report on surface water-groundwater interaction in the Hun River, and enhancement of the water quality model for the Liao River watershed
2. Assistance to the Chinese counterpart in the development and use of the Integrated Groundwater and Surface Water Model (IGSM) for the Liao River watershed
3. Supervision of the installation of the sampling and monitoring system, and advice on the siting of automatic sampling stations.
Project : The study aims to prepare a reform to ensure the distribution of irrigation water more efficiently and at lower cost to public finances.
The study comprises 3 phases: a comprehensive diagnostic of water use by the ORMVA, a feasibility assessment of selling water at an affordable price for beneficiaries, and finally, a proposal for institutional reforms.
Services provided : Assessment of the feasibility of granting concessions:
- to the private sector for irrigation water distribution activities
- to River Basin Agencies for the management of the public water domain.
Project : The PAPLIDEV aims to provide poor households with the means to make choices and the ability to transform these choices into productive actions that alleviate poverty and to improve the capacity of private sector service providers to respond to livestock-related development demands for services.
Services provided : The overall goal of the programme is poverty reduction, improved food security and increased incomes among communities with a high level of livelihood dependence on livestock. HRD was in charge of preparing a proposal for grant financing under BSF for a community health and water supply project in 3 Districts (boreholes, groundwater pumping schemes, gravity schemes, dams)
Project : HRD was responsible for reviewing each proposal in detail from administrative, technical, and financial standpoints. These services were carried out in collaboration with the Ministry for Rural Rehabilitation and Development (MRRD) and under the supervision of the director of the Evaluation Committee (EC).
Services provided : Evaluation of the technical, administrative, and financial quality of proposals submitted by NGOs in response to the call for proposals for the "EC Rural Recovery Programme for Afghanistan 2002-2004 Consolidation Phase"; "EC Water Supply Programme for Drought-affected Areas"; and the "Applied Thematic Research Programme for Afghanistan"
Project : The project involves drilling new boreholes, constructing drinking water distribution networks, and installing solar pumping systems (34 type P4 at 1,500 Wp; 20 type P6 at 4,600 Wp; and 5 type P8 at 6,600 Wp).
Funded under the 9th EDF.
Services provided : Feasibility study of the programme covering 70 new sites. Mapping (GIS), hydrogeological study, socio-economic study, and institutional study. Preparation of the implementation file. Drafting of tender documents for technical assistance, drilling works, supply and installation of equipment, and civil works. Preparation of the financial proposal.
Project : The project aims to improve living conditions through the implementation of soil conservation measures and the mobilization of water resources to meet the needs of the population and their livestock.
Services provided : Final evaluation of the Water and Soil Conservation project. The project involved the construction of hillside reservoirs, flood spreading structures, aquifer recharge structures, and watershed erosion control works.
Project : The European Commission's services requested the Evaluation Unit of the EuropeAid Cooperation Office to undertake an evaluation of the Commission's national cooperation strategy for Lesotho.
The objective of the evaluation was to provide the Commission with the key points and lessons learned from past (1995-2002) and current (2003-2007) cooperation with Lesotho.
Taking into account Lesotho's economic, political, social, and environmental context, the evaluation presents lessons and conclusions together with a set of detailed and operational recommendations, in a report intended to help policy makers and Commission directors implement past and current strategies.
Services provided : The evaluation was divided into 3 main phases, comprising 5 methodological components centred on a set of key questions.
Three main phases:
• Desk study,
• Field work,
• Preparation of the final report.
Five methodological components:
• Structuring of the evaluation,
• Data collection,
• Analysis,
• Assessment,
• Dissemination and feedback.
The evaluation of the strategy and cooperation programme is based on a set of key evaluation questions. The questions were first identified by the evaluation team after reviewing key documentation and following a series of bilateral meetings in Brussels and contacts with the Delegation in Lesotho. For each evaluation question, at least one assessment criterion was identified, and for each of these criteria, appropriate quantitative and qualitative indicators were identified and specified.
Hydro R&D was responsible for the water and sanitation sector.
Project : The project aims to support the economic development of ethnic minorities in Ha Giang province. It comprises 7 components: irrigation, drinking water supply, rural roads, health, agriculture, reforestation, and primary education.
Services provided : End-of-project evaluation of the implementation and impacts of the project on rural infrastructure: drinking water supply and sanitation, irrigated agriculture, rural roads, and suspension bridges.
Project : Construction of infrastructure and implementation of accompanying measures for pollution control in Cocody Bay.
Services provided : Synthesis of studies and proposals for implementing pollution control and development measures for the Abidjan lagoon bays.
- Trends in physico-chemical and microbiological data.
- Land use in the watersheds.
- Assessment of pollution sources and their characteristics.
- Assessment of the regulatory and institutional framework and monitoring procedures.
- Assessment of critical points having a negative impact on the bays.
- Current pollution levels and solutions considered for restoring the lagoon environments.
Drinking Water Supply for the Municipality of Sao Domingos - Hydrogeological Study
Water Supply and Sanitation (WS)
Project : The objective of the project was to identify a water resource sufficient to meet the needs of the Municipality of Sao Domingos over a horizon of more than 20 years.
Services provided : Assessment of the potential of local aquifers. Long-duration pumping tests and interpretation of results. Construction of a new production borehole and supervision of works.
Preparation of technical files and tender documents.
Project : The main objective of the RWS Programme was to improve the living conditions of rural populations in two distinct geographical areas by installing a drinking water supply system to reduce the incidence of waterborne diseases.
Services provided : The works carried out on the islands of Upolu and Savaii included a new river water intake station, 4 km of new pipelines, 2 slow sand filter treatment plants, 2 main reservoirs (10,000 m³ and 8,000 m³), 15 new boreholes, 130 km of distribution networks, disinfection stations, and 15 new reservoirs and water towers.
The purpose of the evaluation was to assess the coherence and relevance of the project, the efficiency and effectiveness of its activities, and the impact and sustainability of the programme's results, and to recommend the actions needed to reinforce the main objective.
Project : Implementation of soil protection and erosion prevention measures for the city of Dosso
Services provided : Evaluation of completed and ongoing activities, implementation schedule, and project administration and finances. Recommendations for the continuation of the intervention.
Project : The objective of the programme is to improve water management by giving due priority to the economically rational allocation of the resource, to resource conservation and the preservation of installed capacity, and to improving water quality.
Services provided : Evaluation and institutional strengthening aimed at:
- ensuring effective implementation of Water Framework Law 10-95, both institutionally and in regulatory terms as well as in public investment sector strategy;
- reducing costs borne by the State budget;
- increasing the efficiency of institutions responsible for water and sanitation management.
Project : The industrial ash disposal site is located in a valley overlooking the village of Awirs. The site is subject to instability episodes and needs to be relocated.
Services provided : The study included investigations and analyses to establish the geotechnical parameters for relocating the disposal site, to define equilibrium and stability slopes, and to determine the critical material parameters for disposal and their long-term behaviour.
Project : The overall objective of the mission is to improve the availability of, and access to, food security for the population of three provinces in northern Afghanistan through the rehabilitation of irrigation systems.
Services provided : Identification and review of existing irrigation networks and maintenance management systems. Assistance to the Ministry of Water Resources and Irrigation and to the Commission in developing the implementation conditions for a watershed rehabilitation and reforestation programme for the Kunduz river basin.
Project : Objective of the assignment:
Carrying out a participatory sanitation study in the municipality of Sao Domingos, considering the various scenarios for developing water distribution to the population.
The sanitation study in the municipality of Sao Domingos had to take into account two scenarios:
the first assuming a network with household connections;
the second without household connections (standpipes).
The study had to consider the costs of the sanitation systems for both scenarios and take into account the socio-economic aspects of implementing these systems.
Services provided : Situation analysis (description of subsoil type, available surface areas, socio-economic and socio-cultural aspects, description of traditional sanitation practices, identification of existing sanitation systems, analysis of problems and constraints – from the target group's perspective, resource protection, health, standard of living, economic viability, service reliability)
Study of possible strategies for liquid sanitation and solid waste: disposal and treatment of stormwater, household wastewater and fecal matter. Study of solid waste collection and treatment. Preparation of technical files and tender documents.
Technical and Financial Evaluation of Proposals Submitted under the Tender for Local Water Management of the Euro-Mediterranean Programme
Water Supply and Sanitation (WS)
Services provided : Evaluation of tenders
Project : The main objective of the programme is to improve water resource management and pollution prevention, and to strengthen monitoring and control activities in the Liaoning section of the Liao river basin.
Services provided : • Review of demand and planning methods in the sector.
• Review of existing methods and means for recovering unpaid bills.
• Analysis of the institutional context and tariff structures.
• Development of alternative institutional arrangements for all sector activities in line with tariff reform.
• Development of a programme to reduce losses in distribution networks.
Project : The project aims to ensure food security for the population by improving agricultural practices and agricultural product marketing, and by rehabilitating rural roads. Accompanying measures include drinking water supply and strengthening sustainability through the implementation of environmental conservation measures.
Services provided : Programme evaluation: impact and sustainability of programme activities, development of conditions and guidance for future activities in the sector in Tanzania. Hydro R&D was responsible for the Drinking Water Supply and Rural Roads components.
Project : The overall objectives were to ensure that responsibilities toward the projects and technical assistance were consistent with the objectives and results set out in the project document.
Services provided : The overall objective of the mission, within the framework of quality assurance services provided to DANIDA, was to ensure that the services delivered at the project and technical assistance levels complied with the objectives and results set out in the project document.
Quality assurance mission for the PADEAR project, Bourgou - Alibori component.
Project : The project aims to strengthen the capacities and human resources of the Water Supply Division of the MCPTC in the provinces of Nam Papa and Vientiane.
Services provided : The objectives of the mission were:
• Refocusing the project based on the findings of the evaluation mission.
• Validating the selection of planned activities in relation to the project's expected results.
• Developing strategies to integrate the project's results into the sector's long-term planning in Laos.
Project : The project aims to ensure food security for the population of North Guéra by improving agricultural techniques and constructing small dams. Accompanying measures include the provision of drinking water supply and sanitation.
Services provided : The Belgian firm Duba proposed supplying the government of Chad with 53 pumps under PSANG II, valued at approximately US$223,000, representing nearly 50% of the total price of the pumps. The objective of this water engineering mission was to provide IFAD with a technical opinion on the feasibility and relevance of this opportunity.
Project : The project aims to support sustainable development in the region by creating new water points to secure the water supply for nomadic populations and their livestock, and by establishing credit and livestock marketing mechanisms.
Services provided : The objective of this study is to produce satellite-based maps incorporating as much relevant information as possible on the current status of permanent water points and pastureland in the Kidal region. These maps will serve as a baseline tool for planning and implementing new water points and for the rational management of existing resources
Services provided : Evaluation of tender files and bids for the technical assistance, EUR 3,500,000.
Project : The objective of the project is to support sustainable development in the region by creating new water points to secure the water supply for nomadic populations and their livestock, and by establishing livestock credit and marketing mechanisms.
Services provided : Feasibility studies, detailed preliminary design files, tender documents and supervision of the construction and installation works for 3 underground dams and 4 photovoltaic-powered pumps.
Project : The objective of the project is the drinking water supply of 20 semi-urban centres and the establishment of a new sewerage network for the city of Lomé.
Services provided : Hydrogeological and geophysical studies for the water supply of 20 semi-urban centres distributed across the country. Socio-economic and technical studies, network sizing calculations, siting of structures, preparation of works tender documents, works supervision.
Institutional support, organization of seminars on water management topics in the centres, support for the national policy of the water supply and sanitation (AEPA) sector.
Project : The objective of the project is to strengthen the capacity and human resources of the "Water Supply" division of the MCPTC in the Nam Papa and Vientiane provinces.
Services provided : Mid-term evaluation of the project, technical assistance and specific technical support.
Project : The objective of the project is to secure the drinking water supply of 4 secondary centres in the 4th Region of Mali (160,000 people) through photovoltaic-powered water supply.
Services provided : Detailed socio-economic analysis of the centres, determination of long-term water needs, accompanying measures to support the management of infrastructure in the context of decentralization.
Detailed hydrogeological and geophysical studies, preparation of specifications for the drilling and equipping of boreholes.
4 photovoltaic pumping systems.
Preparation of the execution file for carrying out the water supply works.
Sizing, network calculations, topographic survey. Preparation of tender documents for works and supplies.
Feasibility Study and Appraisal File for the 8th EDF Water Program in the Northern Region (East Gonja, West Gonja, West Mamprusi)
Water Supply and Sanitation (WS)
Project : The project includes the construction of productive boreholes and small distribution networks, equipped with thermal and solar pumping stations.
It was planned to create 25 small water supply systems from high-yield boreholes equipped with solar pumps.
Services provided : Feasibility study for the 8th EDF rural and semi-rural water program in the Northern Region.
The project aims to construct production boreholes and their associated water supply, and mini-networks fed by solar or thermal pumping stations.
The study included field surveys, a participatory seminar, analysis of the institutional context, and definition of the project's intervention areas, activities and framework.
Project : The program's main objective is to improve water resources management and pollution prevention, and to strengthen monitoring and control activities in the Liaoning section of the Liao River basin.
Services provided : The program comprises 5 components: environmental protection training, institutional development and strengthening, urban planning, water resources management, and air quality management.
HRD was responsible for institutional support and training planning in the field of water resources protection. Institutional study of stakeholders in the water and environmental protection sectors, proposals for institutional strengthening and service restructuring, and establishment of a technical coordination unit. Activities were carried out at the provincial, district and municipal levels.
Project : The project concerns the drinking water supply of 7 health districts, comprising 45 health centres (CSI) and 7 district hospitals (HD) in the Diamare and Mayo Kani departments, the drinking water supply of 50 villages and the construction of 20 small dams in mountainous areas.
Services provided : Detailed hydrogeological and geophysical studies, preparation of detailed designs (APD), supervision of borehole drilling works, pumping tests, and construction of water towers and distribution networks.
Community outreach and awareness-raising among beneficiary populations.
Construction of 20 small dams for soil and water conservation in the Mandara mountains.
Technical and financial supervision.
Services provided : Study of the institutional context for taking over responsibility for the centre's water supply, technical study, sizing of the water tower, network and pump. Detailed financial file.
Project : The objective of the project is to develop the drinking water supply for 4 peri-urban districts of Bamako and to implement an effective solid and liquid waste management system.
Services provided : Formulation of the water supply project for the peri-urban districts of Bamako. Technical and financial file, project justification, description and implementation of the project. Technical study for the water supply of the Lassa district from the EDM city network, plans, sizing and financial file.
Evaluation and Formulation of a Pastoral and Semi-Rural Water Program in the 7th Region (Gao)
Water and Rural Development (WS/AG)
Project : Evaluation and formulation of the pastoral and semi-rural water program in the 7th Region (Gao).
Services provided : • Conducting the pre-feasibility study; analysis of existing geological and hydrogeological data, data processing from the SIGMA database, preparation of geological and hydrogeological maps.
• Water point rehabilitation program, definition and installation of 100 new water points (boreholes, cistern wells, small water supply systems), and pumping systems.
• Estimation of costs and resources required, technical and financial planning.
• Organization of future beneficiaries' participation and implementation of accompanying measures, including participatory seminars.
• Support to the regional water directorate.
Project : The overall objective of the project is to “improve the living conditions of poor peri-urban communities in Dar es Salaam".
The specific objective of the project is “the sustainable supply of drinking water and improvement of sanitation in 14 peri-urban wards of Dar es Salaam".
Services provided : The mid-term evaluation had the following specific objectives:
- To review implementation and performance against the logical framework and local context, including indicators;
- To assess the project's implementation strategy, the management structures put in place, and the timeline of achievements;
- To assess the performance of overall project management and its organisation;
- To verify that the principles of "good governance" are respected and duly applied, through a thorough review of tendering and procurement processes;
- To provide recommendations to ensure the best possible alignment between the project and the current institutional context;
- To propose solutions to address the difficulties or weaknesses encountered by the project;
- To provide recommendations for planning the final phase of the project regarding implementation, overall duration, and the provision of consultants and international technical assistance.
Project : The programme contributes to the development of the Kidal region and town, an area facing a particularly difficult socio-economic context due to the extreme scarcity of its natural resources. Its overall objective is to contribute to the sustainable improvement of living conditions for the population of the Kidal region and their livestock. A first phase took place from 2000 to 2005. A second phase was carried out from 2006 to 2008, and a third phase has since been approved and is currently being implemented, again by the same consortium. The third phase of DDRK (2008-2012) supports the capacities of local authorities, access to vocational training, improved health, access to water, and improvement of the pastoral sector.
Hydraulic engineer: 144 person-months – Hydrogeologist: 36 person-months – Civil engineer: 18 person-months – Topographer/cartographer: 21 person-months
Services provided : HRDI pursues 4 specific objectives, implemented in successive, mutually reinforcing stages:
1. Data collection on water, livestock and fodder resources. Analysis of data and conditions relating to water resources and hydrogeological constraints.
2. Development of new, reliable and secure year-round water points adapted to local conditions (wells, dams, subsurface dams, Kidal water supply study).
3. GIS for the environmental management of water, livestock and pasture resources, resource mapping.
4. Training of local partners in hydrogeology, geophysics, operational and maintenance procedures, and GIS.
HRDI is specifically responsible for all studies, implementation monitoring, and supervision and monitoring of works related to water resource management, including:
- Studies, tendering and works supervision for improving water supply in 5 towns in the Region.
- Provision of an international hydrogeologist plus various short-term experts (hydraulics, sanitation, GIS, etc.)
- Detailed design (APD), tender documents (DAO) and works supervision for 5 photovoltaic water supply installations (1,500 Wp) in the Abeibara, Tine Essako and Aghébogho areas. - Improvement of pastoral water conditions
Services provided : Analysis of pumping tests, development of software for interpreting fracture flow (Greengarden-Witherspoon method), estimation of the production capacity of water supply boreholes for the mine's industrial operations.
Project : The objective of the project is the partial replacement of the drinking water distribution network of Villers-la-Ville and the extension of the network to peripheral areas.
Services provided : Preliminary design, detailed design and execution file for the directional drilling works under the Thyle river, for laying a water supply extension pipe on rue de Marbais. Inspection and supervision of the works.
Project : Infiltration of oil from the surface was the driving force behind the diffusion of oil at the water table at a depth of 30 m. Pre-existing remedial measures included 11 deep wells with skimmer pumps removing free product from the water, but these were not meeting the expectations of the environmental agency. A rolling mill renovation programme is underway to stop the oil leak.
Services provided : Hydrogeological study and modelling of kerosene contamination from the aluminium rolling mills at the LM Star plant in Bridgnorth. Determination of the site's hydrogeological characteristics with a view to modelling the hydrocarbon plume and forecasting the extent of contamination in the aquifers.
Project : The following results were expected:
i. natural aquifer levels are known, as well as their normal cyclical fluctuations
ii. water quality is determined, along with its variations,
iii. the various aquifers have been identified and located,
iv. the characteristics of the aquifers are largely determined,
v. groundwater flows toward watercourses and springs have been identified, and recharge and discharge mechanisms are understood.
Services provided : Establishment of the baseline environmental situation:
1. Collection and analysis of geological, hydrogeological and mining data and reports from the former phosphate exploration of a carbonatite massif.
2. Inventory of piezometers and springs, measurement of levels and flow rates, identification of aquifers, and conceptual modeling of the main aquifer.
3. Preparation of a database and piezometric maps using MapInfo.
Mid-Term Evaluation of the Integrated Water Resources Management Program (IWRM) - Technical Aspects
Water Supply and Sanitation (WS)
Project : HRD was responsible for the technical component of the overall evaluation of the implementation of the Integrated Water Resources Management program at the national level.
Services provided : Specific points addressed included technical approaches to data acquisition and processing (GIS), the watershed-based approach, data acquisition and monitoring networks, evaluation of technical reports, and formulation of recommendations for resolving any problems and adjusting program components.
Evaluation of the CIFCD Action Plan for Drinking Water Supply in the Fourth Region (Ségou)
Water Supply and Sanitation (WS)
Project : The project's objective is to supply hand pumps specifically designed for deep wells and to establish a sustainable management structure in 50 villages of the 4th Region.
Services provided : HRD was responsible for evaluating the program's progress: program relevance, implementation effectiveness, results, and impact at the local, national and regional levels, as well as program sustainability.
Identification of the respective roles of the beneficiary populations, the private sector (local artisans and European suppliers) and the State (programming, monitoring and participation role), and assessment of the impacts for each of these stakeholders. The study also identified dynamics conducive to long-term development and proposed a strategy to sustain and amplify the results of the action plan.
Appraisal of the Rural and Semi-Rural Water Project in the Batcham District
Water Supply and Sanitation (WS)
Project : The project's objective is to supply drinking water to the population of the Batcham district (160,000 people).
Services provided : Preparation of an appraisal file based on objective-oriented intervention planning, including drafting the technical and financial files relating to the works to be carried out in the Batcham district; definition of interventions within the overall framework of "water resources management and soil protection"; organization and facilitation of a participatory seminar to define the project's activities.
For each site, definition of water supply needs, estimation of costs and resources required, and preparation of technical specifications and tender documents for the works.
Formulation of the Nyeri Water Project and Water Resources Development
Water Supply and Sanitation (WS)
Project : The project's objective is to ensure food security for the population in 6 districts of Nyeri province through the development of irrigation potential. Complementary actions include improving drinking water supply and sanitation services.
Services provided : Diagnosis and proposed actions for sanitation and water supply under the Nyeri development project. Project formulation and pre-appraisal report. Context, interventions, activity schedule and cost estimates, viability factors and assessment of the infrastructure to be established: water points, community health facilities, and sanitation conditions in villages.
Project : The program contributes to the development of the Kidal region, which presents a particularly difficult socio-economic context due to the extreme precariousness of its natural resources. Its overall objective is to contribute to the sustainable improvement of living conditions for the population of the Kidal region and their livestock.
Services provided : The 5-year program had 4 specific objectives, carried out in successive, mutually reinforcing stages:
1. Development of new perennial, secure water points adapted to local conditions.
2. Improvement of livestock-raising conditions and animal health support.
3. Support for livestock product marketing and training.
4. Construction of social infrastructure, and support in the fields of education and health.
HRDI, together with Proman s.a., was responsible for overall implementation follow-up, works control and supervision.
Project : Final evaluation of the RESO programme, comprising 4 sub-programmes with the specific objective of improving the population's access to drinking water through the construction of new water supply facilities, strengthening local capacity for facility management, and improving knowledge of water resources and pollution control measures.
Services provided : Evaluation of each sub-programme:
• Sub-programme "master plan and planning": water resources master plan.
• Sub-programme "rural water supply": construction of 360 boreholes and 40 wells, rehabilitation of 400 boreholes and 50 wells.
• Sub-programme "semi-rural water supply": construction of 30 drinking water supply networks for medium-sized villages, with stand-alone units (photovoltaic systems).
• Sub-programme "water resources development": small-scale works and land management.
Project : The project's objective is to establish a bottling plant for the commercial marketing of water from the Saint-Pois spring.
Services provided : Assessment of the hydrogeological resources of a catchment area, and of water quality, with a view to industrial bottling operations.
Project : The project's complementary actions concern the supply of drinking water to 50 villages using special hand pumps designed for deep static water levels, and the implementation of a maintenance system adapted to local socio-economic conditions.
Services provided : Organization of a formulation workshop among program operators; preparation of technical and financial proposals, and determination of the nature, costs, modalities and implementation schedule of the program and its activities.
Project : The project's objective is to rehabilitate the well fields, replace the existing distribution network, and extend it to the outlying districts.
Services provided : Preparation of the master plan for the rehabilitation and improvement works of the water supply system of the city of Maroua.
Preparation of technical files and tender documents for works funded under Belgian cooperation.
Project : Reconnaissance study for the opening of a new limestone quarry. Inventory and assessment of the potential hydrogeological and geotechnical damage to the future limestone quarry, related to surrounding former mines, groundwater drawdown and blasting operations.
Services provided : • Inventory and location of former mines in the region (alum mines, coal mines, lead-zinc mines), collection of plans and computer-based mapping (AutoCAD, Surfer).
• Analysis of mining and dewatering methods, assessment of the current condition of former mine workings and the risks they present.
• Hydrogeological study: inventory of water points and springs, identification and functioning of the various aquifers, estimation of dewatering rates and drawdown caused by quarry dewatering using an Excel macro-based model.
• Data processing, geotechnical and hydrogeological assessment, preparation of a risk map.
Project : Regional Solar Program: photovoltaic water-pumping systems and rural electrification in the 9 CILSS member countries.
The project provided for 72 solar installations in Chad, 24 in Gambia, 150 in Mali and 61 in Senegal.
Services provided : Definition of the content and implementation principles of Regional Solar Program II at the regional level. Hydro R&D was specifically responsible for the Mali, Gambia, Senegal and Chad components. The study consisted of:
• Establishing the current status of sectoral policies and solar water supply achievements in the 9 countries and proposing guidance.
• Updating operating and management conditions, analyzing maintenance contracts and system costs, and analyzing demand and savings.
• Identifying resources available for program financing at the national level.
• Defining the second phase at the institutional and financing levels, including CILSS and State responsibilities, activities and implementation schedule.
• Defining implementation procedures and modalities.
• Estimating costs and the financing plan.
Project : The project's objective is to support sustainable development in the region by creating new water points to secure the water supply for nomadic populations and their livestock, and by establishing credit and livestock marketing mechanisms.
Services provided : Program definition, preparation of the appraisal and subsequent implementation documents. Objectives, expected results, activities, financial planning, and definition of implementation procedures.
Detailed hydrogeological and geophysical studies in a particularly challenging environment.
Preparation of technical specifications for boreholes, wells, cistern wells and underground dams.
Water Resources Feasibility Study for the Kalsaka Gold Mine Site
Water and Industry (WS/IN)
Project : Exploration and assessment of water resources, groundwater aquifer hydrogeology for the gold mine's water supply.
Services provided : Coordination and execution of groundwater exploration:
• Contracted works, preparation of drilling contracts.
• Inventory of water points around the mine (dams, wells and boreholes), piezometry, hydrochemistry.
• Supervision of drilling operations and pumping tests.
• Collection of available information, analysis of water legislation in Burkina Faso, hydrogeological analysis and reporting.
Project : The project's objective is to ensure food security by improving irrigation techniques, marketing agricultural products, developing rural infrastructure, and implementing soil conservation measures.
Services provided : Evaluation of program implementation (water supply, sanitation and accompanying measures) in relation to its objectives, activities and results, with particular attention to budgets and compliance with the implementation schedule. Identification of external factors, problems and constraints affecting the project. Analysis of the methodology followed and recommendations for continuing the program.
Project : The objective of the project is to improve food security through the creation of new irrigated areas.
Services provided : Assessment of the water resources of the agro-forestry programme area in the Bambey and Diourbel departments (groundnut basin):
• Redefinition of catchment and pumping systems according to hydrogeological conditions;
• Preparation of geological, piezometric and salinity maps;
• Unit prices and budget estimates for the component;
• Development of the implementation plan and monitoring indicators.
Services provided : Drafting of the preparatory document for the decentralization and reform of the rural water supply and sanitation sector.
• Identification of critical issues for implementing the decentralization process.
• Definition of procedures for establishing the reforms.
• Study of the implementation of a transitional institutional plan.
• Review of special conditions for developing decentralized sector monitoring.
Project : The objective of the project is the partial replacement of the drinking water distribution network of Villers-la-Ville and the extension of the network to peripheral areas.
Services provided : Preliminary design, detailed design and works supervision for the laying of 820 m of PVC 225 pipe between two existing sections on rue de Mellery. Topographic survey, preparation of the complete technical file, preliminary and detailed design, tender documents, and works supervision.
The works include crossing a national road, 2 rivers and a railway underpass (directional drilling), and connections to individual customers.
In addition, a supplementary study on the pressure/flow impact at the “Chapelle” and “Vanden Berg” network nodes, resulting from the works, determining the pipe diameters to be laid and the route to be followed for future extensions.
Project : The objective of the project is to ensure food security for the population of North Guéra by improving agricultural techniques and constructing small dams. Accompanying actions include drinking water supply and sanitation.
Services provided : Diagnosis and proposed actions for sanitation and water supply for the rural development project for the population of North Guéra - project formulation.
Context analysis, definition of interventions, activity schedule and cost estimates, sustainability factors and assessment of the infrastructure to be established.
Project : The project's objective is to enhance the water resources of the Aleg lake region by optimising the management of the catchment area's water resources, and principally those of the Ketchi wadi.
Services provided : HRD is responsible for the data inventory, the organisation of the field work and the preparation of the water management plan (PLAGE).
The management plan's priority is the optimal filling of Lake Aleg, incorporating sociological, economic and environmental data: based on the analysis of water data, establishment of the water balance, hydrological modelling (floods, aquifer recharge, flow, reservoir filling) and definition of the design or rehabilitation criteria for the structures.
Project : Definition of the institutional support for the 8th EDF programme as part of the restructuring of SNAPE.
Services provided : • Setting up and operation of a cost accounting system to strengthen the public service's actions.
• Definition and selection of objectively verifiable indicators for the systematic monitoring of pump repair technicians.
• Identification of capacities within SNAPE to ensure the sustainability of rural drinking water supply services at the regional level.
• Cost estimates for the implementation of this action plan.
Services provided : Contribution to the document "Water Resources Management and Development: a strategic approach", establishing the DG VIII and DG IB guidelines for cooperation in the development of water resources in the member countries of the European Community.
Project : The project involves the drinking water supply of 7 health districts, comprising 45 health centres (CSI) and 7 district hospitals (HD).
Services provided : For each site, definition of drinking water supply (AEP) needs, estimation of costs and resources required, and preparation of specifications and works tender documents. In addition, preparation of specifications for 5 experimental boreholes with stainless steel casing, special filters and "PVC-geotextile" screens. The project comprises the following aspects:
1: preparation of an appraisal file based on objective-oriented planning of interventions, including the drafting of technical and financial files relating to the works to be carried out in the Diamaré and Mayo-Kani departments;
2: definition of interventions in the Mandara Mountains within the overall framework of "water resources management and soil protection";
3: organisation and running of a participatory workshop to define the project's activities.
Project : The project's objective is to provide drinking water supply to 120 villages in Adamaoua Province.
Services provided : Hydrogeological and geophysical siting studies for 120 productive boreholes in Adamaoua Province, in a hydrogeologically unfavourable context (crystalline basement area, granitic or granito-gneissic massifs).
Technical and financial monitoring of the project: drilling works, pumping tests, supply and installation of pumps, and setting up of a maintenance structure by the pump supplier.
Supervision and monitoring of works. Follow-up of the awareness campaign, establishment of village water point management committees, staff training.
Project : Monitoring and supervision of the implementation of the consolidation programme of SOREMIB (Société de Recherches et d'Exploitation Minière du Burkina) in view of its privatisation.
Services provided : Advice to the State in its negotiations with the project's partners, proposals for actions and studies to be undertaken, preparation of terms of reference and draft contracts, coordination and monitoring of all external expert activities.
The activities financed from SYSMIN resources were as follows:
• refurbishment of the power plant,
• driving of underground galleries and acquisition of various equipment for the underground mine operation,
• acquisition of equipment for the processing plant, the crushing circuit, and the analysis laboratory,
• acquisition of mining equipment,
• geophysical survey and geological mapping project to diversify the mining sector.
Project : Stability study of the quarry face at the contact between Viséan limestones and Namurian shales at the Ampsin quarry, in view of an extension of operations.
Services provided : The study consisted of developing a conceptual model of the quarry's current and future operations - geology, geotectonics, hydrogeology, risk assessment and stability modelling - taking into account the technical constraints identified and economic profitability factors.
Mid-Term and Final Evaluation of the "Rural Development Services Network" Program (RDSN)
Water and Rural Development (WS/AG)
Project : The program's objective is to ensure that water and sanitation projects supported by RDSN member organizations provide sustainable drinking water services to rural communities in the regions where the NGOs operate.
Services provided : Mid-term and final evaluation of the activities of the "Rural Development Services Network" (RDSN) NGO network, based in Johannesburg (RDSN), Durban (Rural Support Services - RSS, in KwaZulu-Natal), Tzaneen (Tsogang Water and Sanitation, in Northern Province) and East London (Thuthuka Community Engineering and Development, in Eastern Cape), financed by the EDF.
Evaluation of results achieved, degree of progress (97,000 people concerned), planning and design of rural water supply and sanitation, relevance of activities, socio-economic and financial analysis, training in water and sanitation management, and community development.
Field study and participatory feedback seminar. Report prepared in the EC logical framework format.
Project : The objective of the project is to secure the drinking water supply in the Kaolack and Fatick regions (groundnut basin) through the rehabilitation of existing infrastructure, the drilling of new boreholes and the extension of existing networks to supply 80 satellite villages.
Services provided : Compliance review of the tender documents (DAO) and the Technical File (DT): new boreholes (7), rehabilitations (17) and equipping of 24 sites.
Lot 1: Tender documents for boreholes (7 water supply boreholes); Lot 2: Tender documents for civil works (24 water towers, pipelines, standpipes, etc.); Lot 3: Tender documents for pump equipment (24 electric pumps and vertical-axis motor-pump units).
Participatory formulation workshop. Revision of the technical file.
Project : The project's objective is to ensure food security for the population in the Hoima and Kibaale districts through the improvement and development of irrigation, agricultural product marketing, and the development of rural roads. Accompanying actions include drinking water supply and sanitation.
Services provided : Formulation of the second phase of the Hoima/Kibaale zone development project. Diagnostic assessment and proposed actions for sanitation, water supply and rural roads
Technical, economic and socio-cultural feasibility of the interventions. Context, interventions, activity schedule and cost estimates, viability factors and assessment of the infrastructure to be put in place: water points, community health facilities, sanitation conditions in villages.
Project : The project's objective is to ensure food security for the population through the creation of new water points for market gardening activities and livestock watering. Accompanying measures include improving drinking water supply and healthcare for nomadic populations.
Services provided : Project formulation. Participatory formulation workshop, condition assessment of facilities, maintenance, rehabilitation of boreholes and infrastructure.
Siting studies for pastoral boreholes and wells. Technical, economic and socio-cultural feasibility of the interventions.
Project : Feasibility study of the 8th EDF village water supply project in Upper Guinea and Forested Guinea. The project aims to construct 600 boreholes, 80 wells, and around thirty water supply networks - mini-networks fed by solar pumping stations.
Services provided : The study consists of preparing:
- an assessment and consolidation of the Preliminary Design Report (APS) prepared by SNAPE;
- a Detailed Design Report (APD) for the project;
- an Execution File (DE) and a draft Financing Proposal (PF).
The study includes field surveys, a participatory formulation workshop, an analysis of the institutional context, the scope of intervention and the project's execution framework. The project conditions are defined with a view to ensuring the sustainability of the facilities and achieving maximum impact on the population's living conditions.
Project : Feasibility study, water component, for the copper and cobalt mining operations at the Tenke-Fungurume mine.
Services provided : Hydrogeological survey and study, development of a conceptual model of the aquifer systems and mapping, supervision of the hydrogeological exploration campaign (boreholes, pumping tests, piezometry, spring surveys), assessment of water resources for the mine's water supply, and study of the dewatering of the mining sites.
Project : The project's purpose was to ensure the long-term drinking water supply of hydrogeologically difficult areas of southern Benin.
The difficulties and failures encountered resulted from a combination of factors acting separately or jointly, namely:
- the excessive depth of the aquifer formation, requiring boreholes several hundred metres deep, beyond the usual scope of village-level water supply,
- the depth of the static water level, exceeding 50 m, requiring motorised pumping equipment,
- the discontinuity of certain aquifers, requiring the use of appropriate survey methods to locate them,
- the dewatering of certain traditionally water-bearing formations.
The study area covered 4 departments, namely, from west to east, the northern and central parts of the Mono and Ouémé departments, the southern part of Zou, and the northern part of Atlantique. The study took into account all available data, derived mainly from previous village water supply campaigns.
Services provided : • Hydrogeological study: inventory of projects and water infrastructure built in the project area, analysis of hydrological and hydrogeological data, processing of information from the DH's PROSPER and PROGRES (Access) databases, automated mapping of hydrogeological parameters using Surfer. Preparation and supervision of a hydrogeological survey.
• Study of the institutional organisation of drinking water supply (AEP) in Benin and of the new AEP approach developed by PADEAR.
• Feasibility study and detailed design (APD): characterisation and location of difficult areas, assessment of water resources and water infrastructure, design of AEP schemes adapted to the specific characteristics of the study areas, cost estimates, works schedule.
Project : The project consists of rehabilitating the water supply and distribution infrastructure and irrigation systems of the Fizuli district, infrastructure destroyed during the Nagorno-Karabakh conflict from 1992 to 1994.
Services provided : HRD's mission is to provide technical assistance for the preparation of the works required for these rehabilitations, draft and issue tender documents to local contractors, and monitor the works, in cooperation with the "National Department for Restoration and Reconstruction". Control and supervision of works. The areas of intervention include:
- rehabilitation of power networks, electrification of 22 villages;
- rehabilitation of the irrigation network (7,360 ha), pumping stations, drains, canals;
- rehabilitation of drinking water supply networks: 9 centers, drilling of 9 deep boreholes for water supply, rehabilitation of the hygiene and sanitation control system, water towers, pipelines and public standpipes.
Study on the Role of Stakeholders (Operators and Beneficiaries) in Water Point Management and Financing of the Rural Water Sector
Water Supply and Sanitation (WS)
Project : Studies on the themes identified during the overall evaluation phase of EDF-financed rural water activities: synthesis of project experience results from member countries (CFD, DFID, KfW, Danida, Sida, AGCD, etc.) and recommendations regarding the operational guiding principles for the Commission's future interventions in this field.
Services provided : Studies on the themes identified during the overall evaluation phase of EDF-financed rural water activities: synthesis of project experience results from member countries (CFD, DFID, KfW, Danida, Sida, AGCD, etc.) and recommendations regarding the operational guiding principles for the Commission's future interventions in this field.
Project : The Lisheen mine is located in County Tipperary, in the heart of the Irish Midlands.
Located near Thurles, the mine is one of the region's main employers, thereby helping to sustain the culture and traditions of rural Ireland.
The mine has now been in operation for over a decade and is one of the largest producers of zinc concentrate in Europe.
The Lisheen mine is owned by Vedanta Resources plc, a global leader in the mining sector (2012).
Services provided : Preparation of the pre-feasibility report for dewatering the Lisheen Lead/Zinc mine. Analysis of exploration boreholes with a view to siting dewatering boreholes (plant water supply) and pumping tests correlated with the geotectonic structure, interpretation of pumping tests and chemical analyses. Recommendations on modelling the dewatering and flow of the karst aquifer.
Services provided : Organization and running of a seminar reviewing the activities of the FORMENT project, synthesis of the data from the EDF water supply programme.
Planning workshop using the logical framework approach for developing the programming of future EC interventions in this field in the region: “What viable water service for which population, maintenance system, institutional support and general framework of activities”.
Project : The project's objective is to ensure the drinking water supply of the town of Bozoum and the construction of a distribution network.
Services provided : Geophysical (geoelectrical) study for the siting of 6 drinking water supply boreholes, for a daily volume of 900 m3.
Detailed geological and geophysical studies of the borehole siting areas, aerial photographs, electrical profiling and soundings, results and interpretation, maps, plans and reports.
Project : The project's objective is to ensure the drinking water supply of the town of Birni N'Gaoure (25,000 inhabitants) and the construction of a distribution network.
Services provided : Detailed design study and preparation of tender documents for the drinking water supply works for the town of Birni N'Gaoure, based on the studies carried out in 1989 by the firm Louis Berger International.
Hydrogeological study and construction of a production borehole for the water supply of the town of Birni N'Gaoure (component 1). Siting of structures (abstraction borehole and piezometer), supervision of drilling works, discharge tests, chemical analyses, updating of the execution files for the water supply. Supervision and monitoring of works.
Project : The project's objective was to increase and secure the drinking water supply of the two islands in order to meet growing demand linked to the development of tourism.
Services provided : Overall hydrogeological and geophysical study of the islands of Grenada and Carriacou. Hydrogeological survey and inventory of hydrogeological potential, assessment of water resources and their exploitation potential for the medium-term development of the islands.
Identification of abstraction sites for drinking water supply, geophysical (geoelectrical) surveys, borehole siting and supervision of works. Physico-chemical and bacteriological water analyses. Drafting of tender documents for drilling and pumping test works. Supervision and monitoring of works. Synthesis, thematic maps and reports.
Project : Since the closure of the zinc mine in December 1991, the groundwater level in the former galleries has risen to the point of reaching the entrances to the inclines and flowing into the Glèpe and Crenze rivers. The aim of the study was to attempt to forecast the flow rates and the quality of the water rising in the Vieille-Mine sector.
Services provided : Assessment of technical and environmental risks
• Study of the structural geology and layout of the galleries, determination of the surface water and groundwater flow patterns.
• Analysis of water rise measurements in the Espérance gallery.
• Site reconnaissance survey, pumping test.
• Estimation of future stabilised water table levels in relation to the gallery entrances, and of possible dewatering discharge rates, assessment of zinc concentrations in the dewatering effluent.
Project : Mid-term evaluation of the RESO programme, comprising 4 sub-programmes:
• Sub-programme "master plan and planning": water resources master plan;
• Sub-programme "rural water supply": construction of 360 boreholes and 40 wells, rehabilitation of 400 boreholes and 50 wells;
• Sub-programme "semi-rural water supply": construction of 30 drinking water supply networks for medium-sized villages, with stand-alone units (photovoltaic systems);
• Sub-programme "water resources development": small-scale works and land management.
Services provided : The purpose of the evaluation was to assess the overall progress of activities and the results achieved at mid-term, to evaluate the likelihood of achieving the overall and specific objectives, to examine the factors ensuring the programme's viability, and to propose recommendations for the continuation and successful completion of the programme.
Project : The project involves pumping of approximately 4,000,000 m3/year by the Walloon Region in the vicinity of the town, for water supply to the Flemish Region.
Services provided : Advisory support to the Peruwelz municipal administration on the Walloon Region's abstraction project in the Carboniferous aquifer beneath the Municipality's territory.
The study covered a baseline assessment of the aquifer in the Peruwelz area and of the town's water resources, an evaluation of the implications of the "Transhennuyère" project for the Peruwelz territory and the project's impact on environmental conservation, and the identification of data and monitoring work required to track aquifer evolution and abstraction volumes.
Presentation of the project (technical and legal case file) to the members of the municipal council, covering the impact assessment of the abstraction on the preservation of aquifer resources and recommendations on the preventive measures required.
Overall Evaluation and Synthesis of Commission Interventions in Village Water Supply Projects in West Africa
Water Supply and Sanitation (WS)
Project : Evaluation and studies:
* critical review of the history and implementation of rural water operations in West Africa
* project effectiveness and efficiency
* impact on development and viability of operations
Services provided : Evaluation of financing and studies:
• Critical review of the history and implementation of village water supply operations in West Africa (9,800 water points).
• Project effectiveness and efficiency;
• Evaluation of decentralized cooperation activities (NGOs);
• Impact on development and viability of operations;
• Recommendations for improvements that could be made in this field to development and cooperation policy, as well as to the means, methods and procedures of community aid granted to ACP/LDC States.
Evaluation of the Regional Solar Program (RSP 1)
Water and Energy (WS/EN)
Project : The RSP covers the nine CILSS member countries and involves the supply of 1,040 photovoltaic pumping systems and 690 solar equipment units for community use, totaling 1,298 KWp. The program budget is €34 million.
Services provided : Project evaluation and update on progress: relevance, effectiveness and efficiency, intermediate results, economic and financial analysis, and impact at the local, national and regional levels. These supplies were accompanied by support measures designed to ensure the program's proper implementation (outreach/information activities, training seminars). Definition of the respective roles of the State, beneficiaries, the private sector (local artisans and European suppliers), the water departments (programming, monitoring, participation) and CILSS (coordination).
Project : The objective of the project is to ensure food security for the population by improving irrigation techniques in the wadis and stabilizing dune areas. Accompanying measures include improving drinking water supply, health care and sanitation.
Services provided : Diagnosis and proposed actions for sanitation and water supply for the rural development project for the population of Kanem - project formulation. Context, interventions, activity schedule and cost estimates, sustainability factors and assessment of the infrastructure to be established. Assessment of the various technical options for irrigation and dune vegetation cover.
Project : Support for the administrative and financial organization and establishment of a monitoring/evaluation system for the Rural Economy Development Support Programme
Services provided : • Administrative and financial organization of the programme;
• Establishment of a monitoring-evaluation system;
• Training in project cycle and logical framework management;
• Conducting an audit of the various projects within the programme (BUCADER – Rural Economy Development Support Unit);
• Contribution to improving programme planning and coordination capacity;
• Training of staff responsible for the technical implementation of programmes in the logical framework approach and field activity monitoring-evaluation.
Project : The project comprises 2 main components: water supply with mechanized or motorized pumping, and sanitation and health education. The project area covers the entire country and concerns 52 villages.
Services provided : Detailed evaluation of the project and its results against the planned objectives:
• analysis of the project's design, formulation and execution;
• use, efficiency and impact of the products of the results achieved.
Evaluation of:
• construction of wells, boreholes and supply systems (water towers, standpipes...);
• installation of pumping units, wind pumps and hand pumps, and training of repair craftsmen;
• establishment of a savings system
• installation of 1,750 sanitation systems.
Project : The project's objective is to ensure food security for the population in the Niger River inland delta area by equipping the floodplain areas for flood-recession farming. Accompanying measures include improving drinking water supply and sanitation.
Services provided : Diagnostic assessment and proposed actions for sanitation and water supply for the second phase of the Lake Zone Development Project in Mali (PDZL).
Project formulation and pre-appraisal report. Context, interventions, activity schedule and cost estimates, viability factors and assessment of the infrastructure to be put in place: water points, community health facilities, sanitation conditions in villages.
Services provided : Minutes and drafting of the meeting report of the EEC Commission and Member States expert group on the "Water supply and sanitation in developing countries" sector, as part of the preparation of the European Commission's development cooperation policy compendium for the year 2000 horizon. Summary of Member States' sectoral policies and drafting of the meeting minutes.
Project : Summary of groundwater protection and environmental protection measures for the Walloon Region and the Grand Duchy of Luxembourg.
Services provided : Preparation of summary tables of protection measures covering: policy objectives, legislative instruments, target groups, competent authorities, decision-making processes, monitoring and follow-up.
Areas covered:
• air pollution regime,
• industrial and household emissions,
• agriculture and rural areas,
• controlled landfills and contaminated sites,
• groundwater abstraction regime,
• surface water - groundwater interactions.
Final Evaluation of the Millennium Water Supply and Sanitation Programme, Groundnut Basin Sub-Programme (PEPAM-BA)
Water Supply and Sanitation (WS)
Project : The sub-programme "Millennium Water Supply and Sanitation Programme, Groundnut Basin Sub-Programme" (PEPAM-BA) is a direct bilateral cooperation project between the Government of Senegal and the Kingdom of Belgium.
Its overall objective is: "The number of people without access to safe water and basic sanitation is reduced in line with the Millennium Development Goals."
The distinctive feature of PEPAM-BA is that, among Belgian cooperation interventions in Senegal, it is the one most closely aligned with the spirit of the Paris Declaration. The related infrastructure and studies are thus carried out under national execution by four different directorates within the Ministries responsible for rural water supply and sanitation. Each directorate is responsible for planning and executing its share of the budget.
Its specific objective is: "Access to drinking water, as well as hygiene and sanitation conditions, are sustainably improved for the rural population of the Diourbel, Fatick and Kaolack regions."
Services provided : The objective of the final evaluation of the PEPAM-BA sub-programme was to assess the project's contribution to improving access to drinking water and sanitation for populations in the Belgian Cooperation's area of intervention (Kaolack, Diourbel, Fatick, Kaffrine), with a view to formulating recommendations for the various stakeholders.
A priority of the study was to assess national execution as an implementation modality compared with the co-management approach used in most other Belgian cooperation projects, particularly in the water and sanitation sector, and against the alignment principles applied by other donors.
The assignment involved assessing the methodology, institutional anchoring, activities carried out and results achieved by the sub-programme, and identifying the corresponding lessons learned and recommendations, whether operational or strategic, for future Belgian interventions in the rural water supply and sanitation sector.
Evaluation of the Programme to Improve Access to Drinking Water, Sanitation and Hygiene in Rural Areas of the Republic of Côte d'Ivoire
Water Supply and Sanitation (WS)
Project : The evaluation mission aimed to assess the relevance, efficiency, effectiveness, impact and sustainability of the results of the "Programme to Improve Access to Drinking Water, Sanitation and Hygiene", the rural water supply component of the 4th Post-Crisis Emergency Rehabilitation Programme (PUR IV).
It also made it possible to formulate recommendations on the future direction of European Union intervention in the field of rural water supply and sanitation, including regarding delegated management of small-scale piped water supply systems (mini-AEP).
Support was also provided for the formulation of a rural water supply and sanitation programme (formulated project amount: €25 million).
Services provided : This study comprised 4 parts:
-Critical analysis of the formulation and relevance of the "Programme to Improve Access to Drinking Water, Sanitation and Hygiene"
-Assessment of project achievements against the expected objectives and results
-Recommendations and a summary overview of the rural water supply and sanitation sector
-Support for the formulation of the Millennium Water Supply and Sanitation Programme (PHAM): 100 semi-rural piped water supply systems, institutional support for drafting a water sector policy letter, and a rural sanitation campaign. Budget: €25 million. Organisation of participatory workshops and cost estimates for works and services interventions.
Technical Assistance to the EDF National Authorising Officer in the Award Process for a Services and Works Contract for the Development of 2,500 ha at M'Béwani and the Excavation of 42 km of Collector Drain in Kala Supérieur at the Office du Niger
Agriculture and Rural Development (AG)
Project : Under the 10th EDF, plans included the development of 2,500 ha with full water control in Block "D" of the M'Béwani irrigation scheme and the excavation of 42 km of collector drain in Kala Supérieur at the Office du Niger. Bid openings took place on 26 May 2010 for supervision and control services and on 1 June for the works. The EU Delegation recruited technical assistance to support the Contracting Authority in analysing the bids for the selection of the Consulting Engineer for the supervision and control of the works, and of the contractors responsible for carrying out the works.
Services provided : This assignment concerned exclusively the works contract. The Consultant acted as technical adviser within the Bid Evaluation Committee.
The services provided covered:
-Analysis of the technical and financial bids for the works;
-Selection of the contractors responsible for carrying out the works (2 works lots);
-Preparation of the bid evaluation report.
Project : PAPESPRIM is implemented in the regions of Ségou and Mopti. The Programme operates within a context in which the Strategic Framework for Growth and Poverty Reduction (CSLP II) and the Private Sector Development Policy Letter (LPDSP) form the reference framework for the general policy of the Government of Mali and its development partners.
Component B of PAPESPRIM, "Support to Small and Medium-sized Enterprises at Regional Level", aims to ensure that "the private sector in the target regions contributes significantly and sustainably to economic growth, poverty reduction and job creation, with particular emphasis on the needs of women and young people". Its purpose is to provide institutional, organisational and financial support to development stakeholders so that each, according to its mandate and expertise, can take part in regional development planning and implementation.
Component B of PAPESPRIM has three immediate objectives:
i.Raise awareness among, and strengthen and develop the capacity of, planning officials at the Region, Cercle and Commune levels, to better respond to the needs of the private sector and its support structures;
ii.Strengthen the capacity of the private sector and its support structures and develop human resources;
iii.Develop the minimum infrastructure needed to support regional growth.
Services provided : Support missions addressing specific Project needs were carried out.
These interventions covered:
-Field visits
-Preparation of core documents: roadmap for infrastructure implementation; procedures manual for the Local Government Infrastructure Fund (FICT); standard tender dossier, preparation of the detailed design (APD), preparation of the works tender dossier, works supervision and control; standard tender dossier for the recruitment of a works contractor; model management-delegation agreement for a market infrastructure; standard model tender dossier for the recruitment of a delegated manager
-Preparation of technical notes: bioclimatic construction; comments on the study report on the Local Government Investment Fund Strategy and Delegated Management of local government market infrastructure/facilities; comments on the detailed design (APD) reports for the artisans' house construction projects in Bandiagara and Djenné (ESIAU); comments on the detailed design (APD) report and tender dossier for the artisans' house construction project in Bankass; comments on the detailed design (APD) report and tender dossier for the artisans' house construction project in Koro
-Feedback workshops on the infrastructure implementation process (FICT)
Study on the development and implementation of tools for monitoring investment efficiency in the water and sanitation sector
Water Supply and Sanitation (WS)
Project : Since 2007, with the establishment of the Water and Sanitation Sector Programme (PROSEA), the government has sought to create the conditions for a shift to a sector-wide programmatic approach. Decentralised programming exercises have already taken place in several regions of the country, but progress is still needed. In addition, a shift of part of the funding to Sector Budget Support (SBS) is planned for 2012 for the water sub-sector. The introduction of an SBS-type financing mechanism makes it necessary to carry out efficiency audits of sector activities and to establish tools for monitoring the efficiency of sector investments.
Services provided : The objective of the assignment was to develop a tool for monitoring the efficiency of project implementation in the drinking water and sanitation sector. To achieve this objective, the assignment was divided into several stages:
-Preparatory mission comprising a documentary review, discussions with stakeholders, a cost analysis and summary of findings;
-Development of the tools: clear norms and standards, standardised efficiency-monitoring formats, and a method for completing these standards;
-Field-testing phase for the monitoring tools;
-Tool validation workshop;
-Revision of the tools.
Technical Assistance Mission for Surface and Groundwater Resource Monitoring in the Koulikoro and Ségou Regions.
Water Supply and Sanitation (WS)
Project : The mission's objectives were to establish a water resource monitoring system in the Ségou and Koulikoro regions and to develop an implementation plan for it.
The study addressed the design and cost evaluation of maintenance for:
• a piezometric monitoring network; a groundwater quality monitoring network; a surface water monitoring network • monitoring procedures and a clear, sustainable mechanism for collecting, processing and storing piezometric data in the SIGMA database
The study also addressed:
• rehabilitation needs and requirements for new piezometers; rehabilitation needs and requirements for new surface water monitoring points
• Training of stakeholders within the Regional Directorates of Water Resources (DRH) in both regions.
The groundwater and surface water monitoring and evaluation documents were submitted to a validation workshop.
Services provided : • Diagnostic assessment of the spatial distribution and operational condition of the existing piezometric network and the surface water monitoring network in both regions, and definition of criteria for their development and optimisation. Evaluation of rehabilitation, equipment and maintenance costs for the networks;
• Assessment of locally exploitable renewable water resources for both regions;
• Determination of aquifer regulating capacity for both regions;
• Definition of criteria for the development and optimisation of the groundwater and surface water quality monitoring network; and evaluation of rehabilitation, equipment and maintenance costs; • Definition of a mechanism and procedures for monitoring and managing piezometric measurement networks, and procedures for monitoring water use and the regular collection of data in the target regions;
• Preparation of documents for groundwater monitoring and evaluation; identification of the skills and training needs of DRH staff and local observers; validation workshop;
• Transfer of skills to the Water Resources Inventory Division and training of DRH staff.
No reference matches your search.